EVALUASI PLT BIOGAS TERANTAM COVERED LAGOON (CAL) 700 KW UNTUK PENGEMBANGAN PLT BIOGAS TIPE CSTR Rosyadi, Erlan; Rahmawati, Nurdiah; Pertiwi, Astri; Murti, Galuh Wirama; Fauzan, Naazi; Rini, Tyas Puspita; Muharto, Bambang; Bhaskara, Arya; Saputra, Hens
Majalah Ilmiah Pengkajian Industri Vol 13, No 3 (2019): Majalah Ilmiah Pengkajian Industri
Publisher : BPPT

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (772.901 KB) | DOI: 10.29122/mipi.v13i3.3844

Abstract

Production of Crude Palm Oil (CPO) is increasing from year to year and is predicted to reach 41.6 million tons per year in 2018. Each ton of CPO will produce 3,28 m3 of POME during the production process. Improper handling of POME, besides causing soil pollution and flying, will release methane gas that categorized as GHG. BPPT cooperate  with PTPN V utilized POME to produce biogas and then be converted into electricity in a Biogas Power Plant (PLTBg) in Terantam with a design capacity of 700 kW. The reactor used is a closed Anaerobic Lagoon (CAL) reactor equipped with a recirculation pump. From the evaluations, the technology chosen was not optimal from the operation, its evaluaed from the accumulation of cakes and sludge collected in the reactor which could be disturb during an anaerobic reaction. The next technology development will be carried out with the development of PLTBg in Sei Pagar using CSTR technology. At the same reactor capacity, CSTR has a faster HRT compared to CAL. CSTR is also easier in control of pH and temperature, also requires less land.Keyword : POME, Biogas, CSTR, Covered Lagoon, HRT, OLR
APPLICATION OF INSTRUMENTATION AND CONTROL SYSTEM FOR BIOGAS POWER GENERATION COMMISSIONING AT PTPN V KAMPAR PALM OIL MILL Salehah, Nur Azimah; Prasetyo, Dwi Husodo; Senda, Semuel Pati; Supriyadi, Muhamad Rodhi; Adeliaa, Nesha; Samodra, Bayu; Adiprabowo, Arya Bhaskara; Muharto, Bambang; Anindita, Hana Nabila
Majalah Ilmiah Pengkajian Industri Vol 14, No 1 (2020): Majalah Ilmiah Pengkajian Industri
Publisher : BPPT

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29122/mipi.v14i1.3865

Abstract

Biogas Power Plant (PLT) from palm oil mill effluent had been commissioned by a team from the Center of Technology for the Energy Resources and Chemical Industry, Agency for the Assessment and Application of Technology (PTSEIK-BPPT). The biogas power plant is located in PTPN V Kampar, Riau Province. A PLC (Programmable Logic Controller) has been implemented to support the operation of biogas power plant. Proper sensor selection has been done for each measurement applications. A computer and mimic panel is used as an interface for the operation of PLC. The master control system communicates with the slave control systems and Human Machine Interface (HMI) by means of ethernet communication protocol. Commissioning phase is carried out for 2 hours with a load of 450 kW. Instrumentation and control system is able to measure important variables such as fluctuation in methane numbers, pressures, and biogas flow rate to check the suitability of biogas supply in accordance to gas engine specification.