Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Biner : Jurnal Ilmu Komputer, Teknik dan Multimedia

Analisis Perbandingan Rencana Anggaran Biaya (RAB) Dengan Standar Kementrian PUPR Tahun 2022 Dan SNI Tahun 2008 Pada Proyek Pembangunan Gedung: (Studi Kasus: Pembangunan Gedung Badan Pengelola Pajak Dan Retribusi Daerah Di Papua Barat Daya) Hesa W, Muhammad; Syara, Elfiyusriningsi; Rizal S, Muh
BINER : Jurnal Ilmu Komputer, Teknik dan Multimedia Vol. 2 No. 4 (2024): BINER : Jurnal Ilmu Komputer, Teknik dan Multimedia
Publisher : CV. Shofanah Media Berkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The construction project of the Regional Tax and Levy Management Agency Office Building is located in Mariat Pantai, Aimas District, Sorong Regency, Southwest Papua. The project is an effort by the local government to improve the quality of infrastructure in the coastal Mariyat area where the office building was built to meet safety and health standards. The method in this study is quantitative research. Quantitative research is a research method that collects and analyzes data based on numbers and numerical measurements. The analysis shows that by using the SNI analysis, the results are Rp. 729,477,142,- while by using PUPR, the results are Rp. 809,271,989,- which means that the SNI analysis is more economical than the PUPR analysis. The final results of the study show that the calculation of the cost of building the office building of the Regional Tax and Levy Management Agency using the 2008 SNI analysis is Rp. 729,477.42 while the result of the cost estimate using the 2022 PUPR analysis is Rp. 809,271,989. From the calculation results, the comparison of the cost budget estimate between the 2008 SNI and PUPR 2023 methods, namely the 2022 PUPR method is Rp. 79,794,847 more expensive than the 2008 SNI.
Analisis Kinerja Ruas Jalan Akibat Adanya Aktivitas Pada Pasar : (Studi Kasus: Jalan Buncis, Kabupaten Sorong, Papua Barat Daya) Azizah Paus Paus, Nur; Rizal S, Muh.; Tavip Maryanto, Eko; Rahayu Ning Tyas, Mellany
BINER : Jurnal Ilmu Komputer, Teknik dan Multimedia Vol. 3 No. 4 (2025): BINER : Jurnal Ilmu Komputer, Teknik dan Multimedia
Publisher : CV. Shofanah Media Berkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Afternoon the market one of the busiet commercial centers in Aimas Regency, particularly during traffic congestion periods. The main issue observed is traffic conflicts that result in congestion. This study evaluates the capacity of jalan Buncis leading to the Afternoon Market in Aimas Regency the Afternoon Market, as well as the influence of roadside obstacles on traffic distribution. Data collection includes traffic data on traffic volume, vehicle speed, and road capacity we’re Collected through filed surveys around jalan buncis durung market activities. The analysis was performed using the Indonesia Highway Capacity Manual (MKJI) 1997.method. Surveys were conducted on theree different days og the on Monday, Thursday, and Sunday.The results show that peak traffic reached 199 vehicles/hour, with an average speed and saturation value during the morning peak of 357 vehicles/hour, while off-peak hours recorded 184 vehicles/hour, and the evening peak reached 262 vehicles/hour. Based on the analysis, the Level of Service (LOS) for Jalan Buncis in the Afternoon Market area is classified as Level A, indicating safe conditions, low traffic volume, high speed, and drivers being able to travel at their desired speed.