Penerapan K3 pada Pelaksanaan Proyek Pembangunan Gedung Olahraga (GOR) ASR Center Kota Kendari Sakti, Putra; Pratama, Ardi
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 2 (2025): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i2.44151

Abstract

Occupational safety and health (K3) is a program created for workers or laborers or companies as a form of prevention of work accidents that may occur to workers in the work environment. The purpose of this study was to determine the implementation and supervision of K3 in the implementation of the ASR Center sports building (GOR) construction project in Kendari City. The study was conducted using a descriptive method with quantitative analysis. While data collection was carried out through field observations and distributing questionnaires to staff and workers. The results of the achievement of the implementation of occupational safety and health (K3) on the grandstand ladder work reached 82%, column repair 84%, steel frame installation 79% and roof installation 84%. From the four applications of occupational safety and health (K3), an average percentage of 82.25% was obtained, the four jobs were categorized as "very good". PT. Aji Konstruksi Utama in carrying out safety patrols or direct supervision is carried out by Health, Safety, Environment (HSE) to supervise the work.
Analisis Manajemen Waktu Terhadap Pekerjaan Pembangunan Gedung Poliklinik RSUD Kota Kendari Sakti, Putra; Pratama, Muh Irsan
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 3 (2025): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i3.48404

Abstract

The development of construction services in Indonesia has currently grown, this is marked by the many construction projects. Management is the process of planning, organizing, guiding, and supervising the efforts of organizational members and the use of resources to achieve other organizational goals (Handoko, 2016), while a project is a series of events that are carefully designed, from the beginning to the end of the project aimed at achieving clear goals. The purpose of this study is to analyze the differences in time management using the PERT method and the CPM method. From the results of the study, the optimistic time needed to complete the work using the PERT method, a probability value of 90.82% was obtained for the work to be completed in 85 days or less. From the results of the study, it is known that there are 4 critical paths in the Construction of the Kendari City Hospital Polyclinic Building using the CPM method.
Analisa Kerusakan Perkerasan Jalan Menggunakan Metode Pavement Condition Index (PCI) Studi Kasus: Kel. Lasada Kec. Unaaha Kab. Konawe Sakti, Putra; Alkadri, Alkadri; Islamiyati, Puji Azizah Nur
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 4 (2025): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i4.51391

Abstract

Road damage is a problem caused by various factors, including excessive repetitive traffic loads, temperature and rainfall effects, and poor initial construction quality. Roads that are not properly designed and maintained will experience a decline in both structural and functional quality, resulting in reduced service performance for users. The impacts of road damage include traffic flow disruption, decreased comfort, and increased safety risks. The condition and type of vehicles passing over the road also significantly affect the pavement design and structural durability. A study on the road section in Lasada Village, Unaaha District, shows that the increased traffic volume on the regency road connecting Tuoy Village and Ambekaeri Village has led to various types of damage, such as cracking and potholes. With an approximate length of 1 km, width of 7.2 m, and pavement thickness of 15 cm, this road has experienced a reduction in load-bearing capacity due to unmet construction standards. Consequently, the level of service and comfort for road users has decreased significantly.
Analisis Faktor Keterlambatan Penyelesaian Proyek Peningkatan Jalan Ruas Ambemali (Studi Kasus Jln. Belalo/Lasolo – Jln. Arisunggu) Sakti, Putra; Junarto, Junarto
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.29943

Abstract

Delays in implementing construction projects can have negative impacts on contractors and owners. Contractors whose construction projects are late will experience losses in terms of time and costs, because the profits expected by the contractor will be reduced, or even no profits at all. Respondent characteristics based on the questionnaire were classified into several categories, work experience, latest education, company category and field of work in the company. Factors causing delays in work on the Ambemali Road Improvement construction project, Jln. Belalo – Jln. Lasolo, Wawotobi District, Konawe Regency, according to the perception of PPK/PPTK, Directors, Consultants and Service Providers (Contractors) of PT Kendari Baruga Pratama, is caused by Labor Factors with indicators of contractor negligence, Equipment Factors with indicators of Equipment Damage, material factors with this being the lack of material available around the work site , financial factors indicating limited contractor funds, managerial factors namely inappropriate implementation methods, design suitability factors indicating design changes and other factors namely material sources far from the work location.
Preservasi jalan secara long segment ruas jalan Wawotobi – Lasolo Sakti, Putra; Nasrul , Nasrul
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 4 (2024): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i4.35257

Abstract

The implementation of long segment-based contracts which is considered new for service users and large contractors, the implementation of roads. So it is necessary to understand the system. The parties have difficulty implementing the standards that have been determined and understanding the scope of the work being carried out, resulting in the implementation of long segment-based work not being carried out effectively until now. Seeing the above problems, this research was carried out to The method used in this study uses the Importance perpormance analysis (IPA) questionnaire method. In accordance with the limitations of this study, the number of respondents used was 30 service users and 30 service providers at the Southeast Sulawesi Road Implementation CenterThe method used in this study used the Importance perpormance analysis (IPA) questionnaire method. In accordance with the limitations of this study, the number of respondents used was 30 service users and 30 providers Factors of understanding from Officials Commitment Makers (PPK) as service users place understanding in contract law as the dominant factor with weight (0.195), while service providers/contractors place the ability to understand contract law as the dominant factor with weight (0.206).