Articles

Found 80 Documents
Search
Journal : Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS)

ANALISA PERENCANAAN PONDASI TIANG PANCANG PADA GEDUNG REKTORAT UNIVERSITAS DARUL ULUM JOMBANG Mualif Mualif; Ahmad Ridwan; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (268.987 KB) | DOI: 10.30737/jurmateks.v3i1.894

Abstract

The building is a physical form of the results of construction work that integrates with its domicile. The building functions as a place to live and as a public place like a place of education. As is the case with buildings in general, Darul Ulum University's Rectorate Building in Jombang has a variety of functions, including a venue for various activities both for the chancellor, education staff, and students. In this research, the writer wants to plan the construction of Darul Ulum University, Jombang University Building, with a pile foundation using the Guy Sangrelat method based on SPT data obtained from the project construction site. The pile foundations' design received a vertical load of 36 tons, carrying capacity of a single pile of 12.23 tons, carrying capacity of a group pile foundation of 37 tons, carrying capacity of a pile foundation 37 tons greater than the load that rests on the foundation. The foundation plan used in the Darul Ulum Jombang University Rectorate Building construction is to use a 30 cm diameter pile with a depth of 9.6 meters.Gedung merupakan wujud fisik hasil pekerjaan konstruksi yang menyatu dengan tempat kedudukannya. Gedung berfungsi sebagai tempat hunian dan sebagai tempat umum seperti tempat pendidikan. Seperti halnya dengan Gedung pada umumnya, Gedung Rektorat Universitas Darul Ulum Jombang mempunyai berbagai fungsi meliputi tempat terselenggaranya berbagai kegiatan baik untuk rektor, tenaga kependidikan maupun kemahasiswaan. Pada penelitian ini penulis ingin merencanakan pembangunan Gedung Rektorat Universitas Darul Ulum Jombang dengan pondasi tiang pancang dengan metode Guy Sangrelat berdasar data SPT yang diperoleh dari lokasi pembangunan proyek. Rencana pondasi tiang pancang didapatkan beban vertical sebesar 36 ton, daya dukung tiang tunggal sebesar 12.23 Ton, daya dukung pondasi tiang kelompok sebesar 37 ton, daya dukung pondasi tiang pancang 37 Ton lebih besar dari beban yang menumpu pada pondasi. Rencana pondasi yang digunakan pada pembangunan Gedung rektorat Universitas Darul Ulum Jombang adalah menggunakan tiang pancang berdiameter 30 cm dengan kedalaman 9.6 meter.
ANALISA KEBUTUHAN RUANG PARKIR RUMAH SAKIT BHAYANGKARA KOTA KEDIRI Eko Dany Trismanto; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 1, No 1 (2018): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (192.261 KB) | DOI: 10.30737/jurmateks.v1i1.167

Abstract

Parking is one of the problems that is often encountered in terms of transportation, especially in the cause of congestion that is rampant in various big cities that are developing, as well as Indonesia. Parking is a phenomenon that affects the movement of vehicles when vehicles with high movement intensity will be obstructed by vehicles parked on the shoulder of the road, causing congestion, in connection with this, an evaluation of the parking needs at Bhayangkara was conducted. Kediri City Hospital was implemented. The method used is survey analysis. The highest volume for motor occurred on Saturday, August 5, 2017, with 978 units for a motor on Thursday, August 3, 2017, with 161 units. The parking space requirement based on the Z formula approach is smaller than the existing capacity. If the parking space requirement value is determined based on the Z formula, the parking space requirement value can still be served, so that the parking area capacity can be met. Perpakiran adalah salah satu masalah yang sering kali dijumpai dalam hal transportasi, terutama dalam penyebab kemacetan yang sedang merajalela di berbagai kota besar yang sedang berkembang, begitupun Indonesia. Perpakiran menjadi fenomena yang mempengaruhi pergerakan kendaraan disaat kendaraan-kendaraan yang mempunyai intensitas pergerakan yang begitu tinggi akan terhambat oleh kendaraan yang parkir dibahu jalan sehingga meyebabkan kemancetan, Sehubungan dengan adanya masalah tersebut, maka dilakukan evaluasi kebutuhan parkiran yang ada di Rumah sakit Bhayangkara Kota Kediri. Metode yang digunakan ialah analisa survei. Volume tertinggi untuk montor terjadi pada hari sabtu 5 Agustus 2017 sebanyak 978 unit untuk montor terjadi pada hari kamis 3 Agustus 2017 sebanyak 161 unit. Kebutuhan ruang parkir berdasarkan pendekatan rumus Z lebih kecil dari kapasitas yang ada. Apabila nilai kebutuhan ruang parkir ditetapkan berdasarkan rumus Z maka nilai kebutuhan ruang parkir masih dapat dilayani, sehingga kapasitas area parkir bisa terpenuhi.
EVALUASI PENGENDALIAN MUTU PADA PROYEK PEMBANGUNAN OBYEK WISATA SEDUDO DI KABUPATEN NGANJUK Hari Prasetiawan; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (388.53 KB) | DOI: 10.30737/jurmateks.v2i1.392

Abstract

The supervisory consultant is one of the parties that play a very important role in quality control in construction work. The purpose of this study is to evaluate the performance and role of the supervisory consultant in controlling quality in construction work based on the results of the analysis and observations of weekly and monthly reports made by the supervisory consultant. The data analysis method used in this study is qualitative with comparative and implementation techniques, namely comparing the supervisory consultant's monthly report with Minister of Public Works Regulation No. 06 / PRT / M / 2008 2008 and Guidebook for Procedure for Reporting the Results of Building Supervision, Module - 5 Department of Public Works. The results of the analysis showed that the performance of the supervisory consultant was not optimal in terms of quality control because the supervisory consultant did not follow the reference or method in accordance with existing regulations. Factors less than optimal performance of consultants are influenced by various factors such as lack of labor, unfavorable weather so that it cannot be done overtime until night and the provision of material experiences extinction.Konsultan pengawas merupakan salah satu pihak yang sangat berperan pada pengendalian mutu dalam pekerjaan konstruksi. Tujuan dari penelitian ini adalah untuk mengevaluasi dari kinerja dan peranan konsultan pengawas dalam mengendalikan mutu pada pekerjaan konstruksi berdasarkan dari hasil analisa dan pengamatan laporan mingguan dan bulanan yang dibuat oleh konsultan pengawas. Metode analisis data yang digunakan dalam penelitian ini secara kualitatif dengan teknik komparasi dan implementasi yaitu membandingkan laporan bulanan konsultan pengawas dengan Peraturan Menteri Pekerjaan Umum No. 06/PRT/M/2008 tahun 2008 dan Buku panduan Tata cara Pelaporan Hasil Pengawasan Bangunan Gedung, Modul – 5 Departemen Pekerjaan Umum. Hasil analisis diperoleh bahwa kinerja konsultan pengawas kurang optimal dalam hal pengendalian mutu dikarenakan konsultan pengawas tidak mengikuti acuan atau metode sesuai dengan peraturan yang ada. Faktor kurang optimalnya kinerja konsultan dipengaruhi berbagai macam faktor seperti kurangnya tenaga kerja, cuaca yang kurang mendukung sehingga tidak dapat dilakukan lembur sampai malam hari dan penyediaan bahan-bahan material mengalami keterlamabatan.
ANALISIS DAMPAK LALU LINTAS REVITALISASI PASAR SUMBERGEMPOL KABUPATEN TULUNGAGUNG Ari Styawan; Yosef Cahyo SP; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 2 (2019): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (302.915 KB) | DOI: 10.30737/jurmateks.v2i2.511

Abstract

Traffic Impact Analysis (Andalalin) is an analysis of the influence of land use development on the system movement of surrounding traffic flows. It studies the method described in the 1997 MKJI concludes: 1. The revitalization of Sumbergempol People's Market is expected to attract trips of 88.9 SMP / hour and generate trips of 60.6 SMP / hour. 2. The results of the study area. The condition of the road section prior to revitalization has a V / C ratio of 0.53 with a Service Level in C. b. Predictions in 2019 have a V / C ratio of 0.57. c. Prediction in 2024 has a V / C ratio of 0.61, the performance still in category C. 3 The impact of the service level of the road section based on PM  96th. 2015 is: - The flow is stable, but vehicle movement is controlled by higher traffic volumes with speeds of at least 60 km/hour. - Medium traffic density due to internal obstacles to increased traffic. - Drivers have limitations for speed, change lanes, and overtake. 4. The market developer must provide a motorcycle parking area with a minimum area of 144.3 m2 and 1203.13 m2 for cars.Analisis Dampak Lalu Lintas (Andalalin) adalah analisis pengaruh perkembangan tata guna lahan terhadap sistem pergerakan arus lalu lintas disekitar, Dalam penelitian Andalalin ini metode yang dijelaskan dalam MKJI 1997 yangkesimpulannya: 1. Revitalisasi Pasar Rakyat Sumbergempol diperkirakan akan menarik perjalanan sebesar 88,9 smp/jam dan membangkitkan perjalanan sebesar 60,6 smp/jam. 2. Hasil penelitian adalah: a. Kondisi ruas jalan sebelum dilakukan Revitalisasi mempunyai V/C Ratio 0,53 yang Level Tingkat Pelayanan nya dalam kategori C. b. Prediksi pada tahun 2019 mempunyai V/C Ratio 0,57. c. Prediksi pada tahun 2024 mempunyai V/C Ratio 0,61, kinerja ruas jalan raya mengalami penurunan tapi Level Tingkat pelayanan masih dalam kategori C. 3 Dampak dari tingkat pelayanan ruas jalan berdasarkan PM No. 96 th. 2015 adalah: - Arus stabil, tetapi pergerakan kendaraan di kendalikan oleh volume lalu lintas yang lebih tinggi dengan kecepatan sekurang-kurangnya 60 km/jam. – Kepadatan lalu lintas sedang karena hambatan internal lalu lintas meningkat. – Pengemudi memiliki keterbatasan untuk kecepatan, pindah jalur dan mendahului. 4. Pihak pengembang pasar harus menyediakan tempat parkir motor minimal luasan harus144,3 m2 dan untuk mobil minimal luasan harus 1203,13 m2.
PENELITIAN UJI KUAT TEKAN BETON DENGAN MEMANFAATKAN LIMBAH AMPAS TEBU DAN ZAT ADDITIF SIKACIM BONDING ADHESIVE Agil Dwi Krisna; Sigit Winarto; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (808.798 KB) | DOI: 10.30737/jurmateks.v2i1.385

Abstract

Concrete has the disadvantage of having a low tensile strength and convincing brittle beams with steel inscriptions to anticipate. In this study, the concrete mixture was given additional bagasse and additives of cycacim bonding. This addition was carried out to study and study the effect of bagasse on the compressive strength of normal k300 concrete by replacing bagasse by 0%, 5%, 10% and 15% in compressive loads. Compressive strength specimens in the form of cubes with a size of 15 cm x 15 cm x 15 cm. Testing is done after 28 days. Concrete with increased bagasse of 5% is better able to produce high compressive strength values than others. The addition of bagasse resulted in an average compressive strength of 5%, 229.64 kg / cm2, 10%, 190.35 kg / cm2, 15%, 160.87 kg / cm2.Beton mempunyai kelemahan yaitu mempunyai kuat tarik yang rendah dan bersifat getas sehingga beton diberi tulangan baja untuk mengantisipasinya. Pada penelitian ini, campuran beton diberi bahan tambahan ampas tebu dan zat additif sikacim bonding adhesive. Penambahan ini dilakukan untuk mempelajari dan mengetahui pengaruh ampas tebu terhadap kuat tekan pada beton mutu normal k300 dengan penambahan ampas tebu sebesar 0%, 5%, 10% dan 15% pada beban tekan. Benda uji kuat tekan berbentuk kubus dengan ukuran 15 cm x 15 cm x 15 cm. Pengujian dilakukan setelah 28 hari. Beton dengan penambahan ampas tebu 5% lebih mampu menghasilkan nilai kuat tekan tinggi dari pada yang lainya. Penambahan ampas tebu menghasilakan kuat tekan rata-rata yaitu 5%,229,64 kg/cm2, 10%,190,35 kg/cm2, 15%,160,87kg/cm2.
ANALISA PENJADWALAN DENGAN METODE PERT DAN MATHCAD (Study Kasus Proyek Pembangunan Restaurant Farm House di Lembang) Tofek Nur' Amin; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 3, No 1 (2020): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (276.819 KB) | DOI: 10.30737/jurmateks.v3i1.895

Abstract

Project control is one of the functions and processes in project management that influences the project's outcome. Project control has an essential role in minimizing any deviations that can occur during the project process. In project scheduling, need to, management planning, schedule, and control. Development of Restaurant Farm House planned by PT. DWI MARTHA JAYA is estimated to take 334 days at the cost of Rp. 9.068.780.000,00. Based on information obtained in the field. The type of research method applied in this research is the schedule analysis method on the RAB (Budget Plan) by comparing and analyzing project scheduling using PERT and MathCad methods. The data collection techniques chosen were observation and documentary. From the results of the analysis, the completion time of the Restaurant Farm House construction project is 310 days and a labor cost savings of Rp. 93,341,832.00 out of a total cost of Rp 9.068.780.000,00. So that an overall loss of Rp 8.975.438.168,00. Pengendalian proyek merupakan salah satu fungsi dan proses dalam manajemen proyek yang berpengaruh pada hasil akhir proyek. Pengendalian proyek mempunyai peran penting dalam meminimalisasi segala penyimpangan yang dapat terjadi selama proses berlangsungnya proyek. Pada penjadwalan proyek diperlukan penanganan manajemen kerja yang terdiri dari perencanaan, penjadwalan dan pengendalian. Pembangunan Restaurant Farm House yang direncanakan oleh PT. DWI MARTHA JAYA diperkirakan memakan waktu 334 hari dengan biaya Rp. 9.068.780.000,00. Hal ini berdasarkan informasi yang diperoleh di lapangan. Jenis metode penelitian yang diterapkan dalam penelitian ini adalah metode analisis time schedule pada RAB (Rencana Anggaran Biaya) dengan membandingkan dan melakukan analisa penjadwalan proyek menggunakan metode PERT dan MathCad. Teknik pengumpulan data yang dipilih adalah dengan observasi dan dokumenter. Dari hasil analisis dengan dua metode tersebut diperoleh waktu penyelesaian proyek pembangunan Restaurant Farm House adalah 310 hari dan diperoleh penghematan biaya tenaga kerja sebesar Rp. 93.341.832,00 dari biaya total Rp 9.068.780.000,00, sehingga diperoleh biaya keseluruhan Rp 8.975.438.168,00. 
ANALISA PERENCANAAN SISTEM DRAINASE DALAM UPAYA PENANGGULANGAN BANJIR DI KECAMATAN GANDUSARI KABUPATEN TRENGGALEK Rizqi Dwi Prasetyo; Yosef Cahyo; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (373.001 KB) | DOI: 10.30737/jurmateks.v2i1.405

Abstract

In industrial areas or densely populated settlements, generally found channels that function besides to drain rainwater as well as to discharge domestic wastewater or dirty water from households. Drainage systems are often the main problem in the occurrence of flooding. It is necessary to analyze how their performance and resistance to flooding in the District of Gandusari, Trenggalek Regency. For analysis of drainage system planning in flood prevention efforts, the authors used the Van-Breun and Mononobe calculation methods to determine the number of incoming water discharge, the ideal dimension of the channel to accommodate the inlet discharge channel, and calculate the cost budget plan (RAB) of the builder. From the analysis, results obtained a cumulative discharge of rainwater, and dirty water entering the drainage amounted to 0.4695 m3 / sec. From the calculation, the ideal dimensions of the drainage can be obtained to be able to accommodate rainwater runoff and dirty water discharge using square channels, where the 1.5 m channel height is all added to the water level of 0.2 m and 0.7 m in width 500 m. While the budget plan for the construction costs is Rp. 794,048,000.00 -Di daerah industri atau pemukiman padat penduduk umumnya ditemukan saluran yang berfungsi selain untuk mengalirkan air hujan juga sekaligus untuk pembuangan air limbah domestik ataupun air kotor dari rumah tangga. System drainase sering menjadi pokok masalah dalam terjadinya banjir, maka perlu di Analisa bagaimana kinerjanya dan ketahanan terhadap banjir di Kecamatan Gandusari Kabupaten Trenggalek. Untuk analisis perencanaan sistem drainase dalam upaya penanggulangan banjir penulis menggunakan metode perhitungan Van-Breun dan Mononobe untuk mengetahui angka debit air yang masuk, dimensi ideal saluran untuk menampung saluran debit air masuk dan menghitung rencana anggaran biaya (RAB) pembangunanya. Dari hasil analisa didapatkan debit komulatif air hujan dan air kotor yang masuk ke drainase sebesar 0.4695 m3/detik. Dari perhitungan didapatkan dimensi saluran drainase yang ideal agar mampu menampung limpasan air hujan dan debit air kotor dengan menggunakan saluran berbentuk persegi, dimana tinggi saluran 1,5 m semuanya ditambahkan dengan tinggi jagaan air sebesar 0,2 m dan lebar 0,7 m dengan panjang 500 m. Sedangkan rencana Anggaran Biaya pembangunannya sebesar Rp. 794.048.000,00,-
ANALISA STABILITAS CHECKDAM PABYONGAN DESA MULYOSARI KECAMATAN PAGERWOJO KABUPATEN TULUNGAGUNG Jarno Sutikno; Ahmad Ridwan; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 1, No 1 (2018): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (237.329 KB) | DOI: 10.30737/jurmateks.v1i1.141

Abstract

Checkdam is a control building created due to the presence of water flow with a large enough sediment concentration. Plan to build the Kali Wangi Check dam is one of the flood mitigation efforts that caused severe damage to several drainage structures. Selection of the type of dam is based on the geological conditions of the location where the Check dam is to be built, namely the subgrade in the form of sand, rocky gravel which is also the same on the cliffs, so the type of dam used is the Gravity Type, the pair of river stones with a mixture of 1: 4 outer and The surface is spread with a 1: 2 mixture with a thickness of 2 cm, for the inside using a 1: 3 mixture this mixture is used for the dam and the apron. It is hoped that it can provide a maximum and sturdy function, for that the dam must be subjected to strength control from several aspects, namely control of rolling, shear, soil bearing capacity, and water lifting force on the dam body. From the calculation, it is concluded that the Kali Wangi Check dam is strong withstand the forces acting on it.Checkdam adalah bangunan pengendali yang dibuat karena adanya aliran air dengan konsentrasi sediment yang cukup besar. Rencana pembuatan Checkdam Kali Wangi ini merupakan salah satu usaha penanggulangan banjir yang mengakibatkan kerusakan yang parah pada beberapa bangunan pengaliran. Pemilihan type dam di dasarkan pada kondisi geologi lokasi calon dibangunnya Checkdam, yaitu tanah dasar berupa tanah pasir , kerikil berbatu yang juga sama pada tebing-tebingnya, maka type dam yang dipakai adalah Type Gravitasi, Pasangan batu kali dengan campuran 1 : 4 bagian luar dan permukaan disiar dengan campuran 1 : 2 dengan tebal 2 cm, untuk bagian dalam menggunakan campuran 1 : 3 campuaran ini digunakan untuk bagian dam dan apronnya. Diharapkan dapat memberikan fungsi yang maksimal dan kokoh, untuk itu pada dam harus diadankan pengontrolan kekuatan dari beberapa aspek yaitu kontrol terhadap guling, geser, daya dukung tanah maupun gaya angkat air pada tubuh dam. Dari hasil perhitungan disimpulkan bahwa Checkdam Kali Wangi ini kuat menahan gaya-gaya yang bekerja padanya.
PENELITIAN UJI KUAT TEKAN BETON DENGAN MEMANFAATKAN AIR LIMBAH TETES TEBU DAN ZAT ADDITIVE CONCRETE Mochamad Ahsin Ansori; Ahmad Ridwan; Yosef Cahyo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 2, No 1 (2019): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (693.41 KB) | DOI: 10.30737/jurmateks.v2i1.388

Abstract

Concrete has a weakness that is having a low tensile strength and brittle so that the concrete is given steel reinforcement to anticipate it. This addition was carried out to study and determine the effect of sugarcane waste on compressive strength, flexural strength on normal quality concrete with the addition of 0%, 10%, 20% and 30% in compressive loads. Testing is done after 28 days. Concrete with the addition of 30% sugar cane is more capable of producing high flexural strength than the others. Addition of sugar cane drops resulted in optimum compressive strength of 10%, 16.75MPa, 20%, 16.55MPa, 30%, 16.40MPa. For the highest flexural strength of concrete in the 15/15/60 beam sample, the concrete mixture was added to 30% sugar cane by 5.00 MPa, higher than normal concrete 4.96 MPa.Beton mempunyai kelemahan yaitu mempunyai kuat tarik yang rendah dan bersifat getas (brittle) sehingga beton diberi tulangan baja untuk mengantisipasinya. Penambahan ini dilakukan untuk mempelajari dan mengetahui pengaruh limbah tetes tebu terhadap kuat tekan, kuat lentur pada beton mutu normal dengan penambahan 0%, 10%, 20% dan 30% pada beban tekan. Pengujian dilakukan setelah 28 hari. Beton dengan penambahan tetes tebu 30% lebih mampu menghasilkan nilai kuat lentur tinggi dari pada yang lainya. Penambahan limbah tetes tebu menghasilakan kuat tekan optimum yaitu,10%,16,75MPa, 20%,16,55MPa, 30%,16,40MPa. Untuk kuat lentur beton pada sampel balok 15/15/60 yang paling tinggi yaitu pada campuran beton penambahan tetes tebu 30% sebesar 5,00 MPa, lebih tinggi dari pada beton normal 4,96 MPa. 
ANALISIS DAMPAK LALU LINTAS PENGEMBANGAN PASAR PON TRENGGALEK Dwi Kriswanto; Ahmad Ridwan; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 1, No 2 (2018): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (649.83 KB) | DOI: 10.30737/jurmateks.v1i2.381

Abstract

The planned development of the Trenggalek Pon Market, which is located at Jl.RA Kartini No. 1 Trenggalek, will cause generation and attraction which will result in a decrease in the performance of roads and intersections around the area. For this reason, it is necessary to conduct a Traffic Impact Analysis (Andalalin) in order to minimize the decline in performance of roads and intersections and to provide solutions to solving traffic problems that occur due to the development of the Trenggalek Pon Market. Based on the results of the analysis of traffic impacts for each phase of the activity ie from the current condition (existing), planned year (coming year) without development and with development, there is a very large generation and pull of 338.6 pcu / hour pull and 278.7 pcu / hour.Rencana pengembangan Pasar Pon Trenggalek yang berada di Jl.RA Kartini No 1 Trenggalek, akan menimbulkan bangkitan dan tarikan yang berdampak pada penurunan kinerja ruas jalan dan simpang di sekitar kawasan tersebut. Untuk itu perlu di lakukan Analisis Dampak Lalu Lintas (Andalalin) agar dapat meminimalisir penurunan kinerja ruas jalan dan simpang serta dapat memberikan solusi pemecahan masalah lalu lintas yang terjadi akibat pengembangan Pasar Pon Trenggalek. Berdasarkan hasil analisis dampak lalu lintas untuk masing-masing tahapan kegiatan yaitu dari kondisi saat ini (eksisting), tahun rencana (tahun yang akan datang) tanpa pengembangan dan dengan pengembangan, terjadi bangkitan dan tarikan yang sangat besar yaitu sejumlah 338,6 smp/jam tarikan dan 278,7 smp/jam.