Claim Missing Document
Check
Articles

Found 42 Documents
Search
Journal : Jurnal Teknologi dan Rekayasa Sumber Daya Air

Studi Perbandingan Efisiensi Perbaikan Mutu Air Limbah Domestik melalui Filtrasi Horizontal dengan Beton Porous Recycled Aggregate Berlapis Ariza Julian Hakim; Evi Nur Cahya; Riyanto Haribowo
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.10

Abstract

Domestic wastewater pollution is one of the reasons for the decline in the national Water Quality Index. The increasing number of people with inadequate sanitation facilities requires a solution. Porous concrete with RCA aggregate has the potential to improve domestic wastewater. Made of porous concrete, the filter is made with dimensions of 40×40×5 cm3 using RCA aggregate with 0.5-2.0 cm gradation. Two reactor models of the same size were prepared, containing 3 and 4 layers of filters. Domestic wastewater as a test object comes from Tlogomas Integrated Sewer System, flowed continuously into the model. The results of Test 1 show that the 3-Filters Reactor Model can improve the pH and COD values according to the quality standard, while the 4-Filters Reactor Model can only improve the pH value. The results of Test 2 show that the 3-Filters Reactor Model can improve the pH and TSS values according to the quality standard, while the 4-Filters Reactor Model can only improve the pH value. The average efficiency of the filtration against influent shows that the 3-Filters Reactor Model is better than the 4-Filters Reactor Model with the percentage of improvement in pH 11.54%, BOD 26.15%, COD 20.79%, and TSS 46.37%. However, in sediment trapping, the 4-Filters Reactor Model is superior with 112 mm compared to the 3-Filters Reactor Model which is 100.5 mm.
Studi Penjadwalan dan Pembiayaan Proyek Trashlog PLTA Orya Genyem Kecamatan Unurum Guay Kabupaten Jayapura Menggunakan Microsoft Project Manager 2016 Raya Abdullah; Suwanto Marsudi; Evi Nur Cahya
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.13

Abstract

Successful of a project can be seen from how economical and efficient of the project. Minimizing unnecessary expenses to achieve the profits which planned is the goal of this study. The implementation of the Microsoft Project Manager 2016 program aims to assist in scheduling and financing to achieve efficient projects in terms of cost, labor and time. The 3 alternatives used include analysis of heavy equipment productivity, project duration, labor resource requirement, analysis unit cost of work, cost budget plan and s curve. The preparation of this thesis aims to find out the efficiency of the three alternatives reviewed in terms of cost and time project worked. Which results will be different on each alternative. Alternative 1 (90 days with 8 hours/day, total project cost Rp. 7,184,379,188.80), Alternative 2 (90 days with 11 hours/day, total project cost Rp. 7,355,870,347.94) and Alternative 3 (96 days with 8 hours/day, total project cost Rp. 7,019,783,796.95). In terms of cost and time of the three alternatives, can concluded if setting the right number of days and hours of work can be an efficient alternative.
Studi Efisiensi Penyaringan Air Limbah Domestik Menggunakan Plat Beton Porous 4 Lapis Dengan Sistem Aliran Horizontal Aditya Wibowo; Riyanto Haribowo; Evi Nur Cahya
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.09

Abstract

Keterbatasan lahan menjadi permasalahan dalam sebuah perkotaan untuk membangun IPAL. Oleh karena itu, MCK Terpadu Tlogomas tercipta untuk mengatasi permasalahan tersebut. Dengan memanfaatkan beton porous berbahan dasar recycle agregat berukuran 0,5-2 cm sebagai media filtrasi, penelitian ini bertujuan untuk mencari efisiensi beton dalam memperbaiki kualitas mutu air limbah domestik ditinjau dari pH, amoniak, minyak dan lemak serta total coliform. Model reaktor memiliki dimensi 100×41×40 cm3 dan sekat 4 lapis beton setebal 5 cm dengan debit 2 lt/menit. Model reaktor ini dijalankan secara menerus dari jam 07.00-17.00 selama 10 hari. Sedangkan sampel diambil pada hari ke-1 dan ke-10. Efisiensi parameter Amonia sebesar 20,54% dengan keadaan amonia tidak memenuhi baku mutu air limbah. Kemudian untuk parameter minyak & lemak tidak efisien namun kadar minyak & lemak memenuhi baku mutu air limbah. Dan untuk parameter total coliform terefisiensi sebesar 30,77 dan memenuhi kadar baku mutu air limbah
Studi Manajemen Proyek Rehabilitasi Daerah Irigasi Domas Kabupaten Pasuruan Menggunakan Metode Crashing dan Fasttrack Arya Pradamansyah Putra; Evi Nur Cahya; Jadfan Sidqi Fidari
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 2 No. 2 (2022): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2022.002.02.19

Abstract

Penerapan manajemen konstruksi diperlukan untuk menindaklanjuti penyimpangan yang terjadi pada proyek. Penelitian dilakukan pada proyek pemerintah Rehabilitasi Daerah Irigasi Domas, Kabupaten Pasuruan yang terindikasi mengalami adanya deviasi keterlambatan proyek. Tujuan dalam penelitian ini akan dibahas penggunaan metode Earned Value Analysis sebagai estimasi durasi akhir proyek serta analisa perecepatan proyek menggunakan metode Crashing dan Fasttrack agar dapat kembali on-track. Alternatif yang digunakan pada percepatan Crashing menggunakan penambahan jam lembur, sedangkan Fasttrack dengan memparalelkan hubungan pekerjaan. Pada perhitungan metode Earned Value Analysis, dilakukan titik pemantauan pada minggu ke-7 dan ke-11. Didapatkan hasil Schedule Performance Index (SPI) masing-masing sebesar 0,507 dan 0,751. Hal ini menandakan bahwa proyek mengalami schedule overrun atau ketidakefektifan karena hasil SPI kurang dari satu. Kemudian, dari hasil tersebut, dilakukan perhitungan Estimation Completion Date (ECD) pada titik pemantauan dengan masing-masing hasil -70,66% dan -18,95% terhadap durasi normal jika performa proyek tetap. Maka dari itu, dilakukan perhitungan percepatan dengan metode Crashing yang dimulai pada minggu ke-11 dengan hasil efektivitas durasi sebesar 23,33% dan efisiensi biaya sebesar 14,24%. Berbeda dengan percepatan metode Fasttrack yang dimulai pada minggu ke-7 didapatkan efektivitas durasi sebesar 16,03% dan efisiensi biaya sebesar 14,43%. Implementation of construction management is needed to follow up on deviations that occur in the project. The research was conducted on the government project for the Rehabilitation of the Domas Irrigation Area, Pasuruan Regency which indicated that there was a deviation from project delays. The purpose of this study will be to discuss the use of the Earned Value Analysis method as an estimate of the final project duration and analysis of project acceleration using the Crashing and Fasttrack methods so can be back on track. The alternative used in the acceleration of Crashing is to add overtime hours, whereas Fasttrack is to parallelize the task dependencies. Monitoring points are performed in the Earned Value Analysis method calculation at the 7th and 11th weeks. The Schedule Performance Index (SPI) results are 0.507 and 0.751, respectively. Because the SPI result is less than one, this indicates that the project is experiencing a schedule overrun or ineffectiveness. Hence, based on these results, an Estimation Completion Date (ECD) is calculated at the monitoring point, with results of -70,66% and -18.95%, respectively, of the normal duration if project performance remains. Accordingly, the Crashing method was calculated at week 11 with the results of duration effectiveness is 23,33% and cost-efficiency is 14,24%. In contrast to the Fasttrack method in the 7th week, the duration effectiveness is 16,03% and the cost-efficiency is 14,43%.
Analisa Rembesan Terhadap Terjadinya Piping pada Bendungan Cijurey Kabupaten Bogor Provinsi Jawa Barat Denny Ahmad Fauzi; Suwanto Marsudi; Evi Nur Cahya
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 3 No. 2 (2023): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2023.003.02.043

Abstract

Bendungan Cijurey merupakan bendungan tipe beton gravitasi atau tipe RCC dengan material beton yang memiliki nilai permeabilitas rendah. Secara struktur, tipe RCC memiliki lift joint yang rawan dilalui oleh air sehingga dapat menyebabkan rembesan. Bendungan ini terletak pada lapisan tanah yang mendominasi yaitu batulempung dan batupasir, dimana memiliki nilai permeabilitas yang berbeda dengan daya dukung yang rendah, selain itu debit rembesan yang terjadi akan memiliki pola yang berbeda. Analisa rembesan dan piping menggunakan bantuan software Geostudio SEEP/W. Hasil analisa debit rembesan yang terjadi untuk kondisi normal (El. +286 m) yaitu 0,00196 m3 /dt dan untuk kondisi banjir 0,002 m3/dt dan untuk kondisi banjir (El. +288,28 m) yaitu 0,00076 m 3 /dt. Nilai faktor keamanan terhadap piping yaitu untuk kondisi normal (El. +286 m) yaitu 10,75 > 4 dan untuk kondisi muka air banjir (El. +288,28 m) yaitu 10,33 > 4, dapat dikatakan bendungan aman terhadap terjadinya piping.
Studi Perencanaan Manajemen Pelaksanaan Penjadwalan Pengembangan Jaringan Distribusi Air Dan Sambungan Rumah (Sr) Desa Warungdowo Kabupaten Pasuruan Provinsi Jawa Timur Alamsyah, Muh Arsyil; Pitojo Tri Juwono; Evi Nur Cahya
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 3 No. 2 (2023): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2023.003.02.056

Abstract

Dalam pembangunan infrastruktur diperlukan manajemen konstruksi sebagai cara agar proyek berjalan dan mencapai hasil waktu, biaya, dan mutu yang terbaik. Penulisan studi ini bertujuan untuk menganalisa percepatan proyek pengembangan jaringan distribusi dan sambungan rumah (SR) Desa Warungdowo Kecamatan Pohjentrek Kabupaten Pasuruan Provinsi Jawa Timur menggunakan Microsoft Project Manager 2016. Data didapat akan digunakan untuk perhitungan perbandingan dua alternatif analisis yang berbeda yaitu penambahan jam kerja dan penambahan alat berat dalam optimalisasi pengerjaan proyek. Setelah analisis dilakukan didapatkan percepatan alternatif Pembangunan infrastruktur proyek pengembangan jaringan distribusi dan sambungan rumah (SR) Desa Warungdowo Kecamatan Pohjentrek Kabupaten Pasuruan Provinsi Jawa Timur, didapatkan hasil metode yang dapat mempercepat waktu serta meminimalisir biaya adalah alternatif penambahan jam kerja. Dari durasi awal pengerjaan proyek selama 150 hari turun 16% sehinga menjadi 126 hari, dengan penurunan biaya sebesar 1,84%. In infrastructure development, construction management is needed as a way for projects to run and achieve the best time, cost, and quality results. The writing of this study aims to analyze the acceleration of the project to develop a distribution network and house connection (SR) Warungdowo Village, Pohjentrek District, Pasuruan Regency, East Java Province, using Microsoft Project Manager 2016. The data obtained will be used for comparative calculations of two different alternative analyses, namely the addition of working hours and the addition of heavy equipment in optimizing project work. After the analysis was carried out, an alternative acceleration was obtained for the development of infrastructure for the distribution network development and house connection (SR) project Warungdowo Village, Pohjentrek District, Pasuruan Regency, East Java Province, the results of methods that can speed up time and minimize costs are alternatives to increasing working hours. From the initial duration of project work for 150 days decreased by 16% to 126 days, with a cost decrease of 1.84%.
Kajian Hidrolika Pelimpah Bendungan Surumana menggunakan Debit Banjir Rancangan Akibat Climate Changepada Uji Model Tes Misbachussudur, Mochamad; Very Dermawan; Evi Nur Cahya
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 3 No. 2 (2023): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2023.003.02.049

Abstract

Bendungan Surumana akan dibangun di hulu Sungai Surumana, Desa Ongulara, Kecamatan Banawa Selatan, Kabupaten Donggala tepatnya pada koordinat 0º57’9,36” LS -119º36’48,77” BT atau 790890.87 E-9894621.94 S zona 50 M UTM. Untuk menghasilkan perencanaan dan desain pelimpah Bendungan Surumana dengan fungsi dan karakteristik hidrolik yang baik, dilakukan kajian hidrolika pelimpah Bendungan Surumana pada uji model tes dengan skala 1:60 di Laboratorium Teknik Sungai. Hal ini bertujuan untukmengetahui kondisi hidrolika aliran secara analitis dan hasil pengujian mulai dari hulu sampai dengan hilir pelimpah, kedua untuk mengetahui kondisi hidrolika aliran telah memenuhi kaidah hidrolika ataukah tidak setelah dilakukan uji model tes dengan debit banjir rancangan akibat climate change, ketiga untuk mengetahui kondisi gerusan lokal yang terjadi di sungai hilir saluran pelimpah.Pelimpah Bendungan Surumana yang diujikan adalah pelimpah samping menggunakan variasi debit banjir rancangan akibat climate change. Hal ini beriringan dengan perencanaan bendungan saat ini yang tentunya kondisi global warmingakan mempengaruhi ketinggian permukaan air laut, maka climate changejuga menjadi pertimbangan.Debit operasi yang dibahas adalah debit climate changeQ1000th(Qdesain). Hasil uji model tes berdasarkan kriteria hidrolika menunjukkan telah memenuhi kaidah atau kriteria hidrolika yang berlaku untuk debit pengujian Q1000th(Qdesain). Empatpoin kriteria hidrolika hasil uji model tes dalam kondisi memenuhi dengan rekomendasi.
Studi Penjadwalan Pelaksanaan Pembangunan Proyek Penanganan Pasca Bencana Banjir Bandang di Kecamatan Bumiaji Kota Batu Devi, Agung Ayu Gayatri; Pitojo Tri Juwono; Evi Nur Cahya
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 3 No. 2 (2023): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2023.003.02.059

Abstract

Bencana banjir bandang yang sempat melanda Kecamatan Bumiaji, Kota Batu pada tanggal 4 November 2021 pukul 14.00, sehingga mengakibatkan kerusakan talud dan alur sungai pada Sungai Kricik. Menanggapi hal tersebut, maka diperlukan adanya penanganan terutama pada pengamanan tebing dan saluran. Namun, dalam penanganan proyek ini sempat terjadi keterlambatan dikarenakan beberapa faktor. Oleh karena itu, tujuan dari penelitian ini adalah untuk mengoptimalkan waktu, sumber daya, dan alat berat yang digunakan dengan biaya proyek yang paling efisien dengan menggunakan aplikasi Microsoft Project. Salah satu pendekatan yang digunakan adalah dengan meningkatkan durasi jam kerja dan jumlah alat berat yang digunakan. Permasalahan ini dianalisis melalui evaluasi jadwal pekerjaan, dengan solusi alternatif yang fokus pada percepatan proyek melalui peningkatan penggunaan alat berat dan jam kerja. Hasil analisis menunjukkan bahwa durasi normal proyek adalah 122 hari kerja. Melalui penjadwalan alternatif yang paling optimal, yaitu dengan penambahan durasi jam kerja, rencana anggaran biaya dapat dikurangi sebesar Rp. 1.146.214.952 atau 3,06%, dan durasi proyek dapat dipercepat selama 3 hari atau 2,52%. A flash flood occurred in Bumiaji Subdistrict, Batu City on November 4, 2021 at 14:00, causing damage to the embankment and river channel of the Kricik River. To address this situation, it is essential to take action, particularly in securing the cliffs and channels. However, there were delays in implementing this project due to various factors. Consequently, the aim of this study is to optimize the project's time, resources, and heavy equipment usage while achieving the most cost-efficient outcome using the Microsoft Project application. One strategy employed involves extending the working hours and increasing the number of heavy equipment used. The problem was analyzed by evaluating the project schedule, and alternative solutions were proposed to expedite the project by maximizing the utilization of heavy equipment and working hours. The analysis revealed that the normal project duration was 122 working days. By implementing the most optimal alternative schedule, which includes extending the working hours, the planned budget can be reduced by Rp. 1,146,214,952 or 3.06%, and the project duration can be shortened by 3 days or 2.52%.
Analisa Stabilitas Lereng pada Bendungan Manggar di Kota Balikpapan Wicaksono, Dadang Teguh; Pitojo Tri Juwono; Evi Nur Cahya
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 4 No. 1 (2024): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2024.004.01.025

Abstract

Bendungan Manggar adalah bendungan tipe urugan tanah homogen yang dilengkapi dengan chimney drain yang dihubungkan dengan horizontal blanket drain. Puncak bendungan diperkeras dengan paving beton dan pada tahun 2019/2020 puncak bendungan dipekeras dengan aspal, lereng hulu diberi perlindungan blok beton (semula didesain dengan rip-rap batu) dan lereng hilir dilindungi dengan gebalan rumput dan sistem drainasi permukaan. Pada tumpuan kanan, saat penggalian pondasi bendungan ditemukan adanya lapisan pasir halus sehingga galian pondasi dibuat menjorok masuk kedalam bukit tumpuan. Karena lapisan pasir halus cukup tebal dan tidak dapat dibuang seluruhnya, untuk menghindarkan terjadinya rembesan yang berlebihan, lereng hulu bendungan dipasang blanket kedap air dari tanah lempung. Penentuan besaran gempa desain bendungan mengikuti pedoman pada “Pedoman Pd- T- 14-2004 A” Analisa Stabilitas Bendungan Urugan akibat Gempa dimulai dengan menentukan faktor risiko keamanan bendungan. Stabilitas terhadap aliran filtrasi dengan SEEP/W menunjukkan debit rembesan, gejala buluh, dan gejala sembulan aman. Stabilitas lereng metode Bishop dengan SLOPE/W menunjukkan kondisi statis, OBE 100, dan MDE 5000 aman
Studi Manajemen Konstruksi Pekerjaan Main Dam Dan Spillway Pada Bendungan Margatiga Kabupaten Lampung Timur Provinsi Lampung Reza Indra; Evi Nur Cahya; Suwanto Marsudi
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 4 No. 1 (2024): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2024.004.01.047

Abstract

Kebutuhan akan air merupakan kebutuhan pokok bagi masyarakat yang harus dipenuhi oleh pemerintah yang diperoleh dari pengelolaan sumber daya alam dalam mendukung program ketahanan pangan nasional, proyek pembangunan Bendungan merupakan infrastruktur yang dapat mendukung ketahanan pangan di Indonesia. dibutuhkan suatu manajemen untuk mengelola kegiatan proyek Bendungan Margatiga dari awal rangkaian kegiatan proyek hingga berakhirnya kegiatan proyek. Terdapat dua alternatif yang akan diterapkan dalam mengatasi permasalahan penelitian ini yaitu melalui pemberian durasi tambahan terhadap waktu kerja harian dan penambahan alat berat. Dari hasil analisa didapatkan bahwa alternatif penambahan jam kerja harian memberikan efisiensi waktu sebesar 5,35% dengan penurunan rencana anggaran biaya sebesar 1,23% dibandingkan nilai kontrak. Sementara alternatif penambahan alat berat memberikan efisiensi waktu sebesar 8,38% dan penurunan rencana anggaran biaya sebesar 1,19% dibandingkan nilai kontrak. Sehingga dalam studi ini dipilih alternatif penambahan alat berat yang ditinjau menjadi alternatif yang lebih baik dari segi waktu yang lebih optimal dan biaya yang tidak jauh berbeda dengan penambahan jam kerja.
Co-Authors -, Rizka Anindya Nurus Shobah Aditya Wibowo Afan Allail Rofikha Alamsyah, Muh Arsyil Alfiko Rail Prameswara Andawayanti, Ussy Andre Primantyo Hermawan Arissaputra, Andry Sofyan Aritonang, Samuel Yosema Ariza Julian Hakim Arrosyad, Muhammad Arya Pradamansyah Putra Ashari, Syaiyidati Fitri Nur Khoiriah Assajjad, Nurrohman Adi Aulia, Nanda Daffa Muhammad Faeyza Delivean Rakha Dermawan Denny Ahmad Fauzi Devi, Agung Ayu Gayatri Dharyatiputri, Jihan Faradillah Dian Sisinggih Donny Harisuseno Eka Juli Dwi Mulyawati Elang Timur M. Patih Ragananda Eliana Renate Simanungkalit Emma Yuliani Ery Suhartanto Eva Arifi Eva Resmani Fakhruddin, Daffa Budi Fakhrulloh, Ahzar Febrianto, Ridwan Febriyanti Maulina Fikhoir, Yalim Firdaus, Adam Wahyu Fitriyasari, Ammy Geraldine, Monica Odelya Gunawan, Alif Ramadhani Medisia Putri Guntoro, Dani Eko Guntoro, Dani Eko Hartanto, Tomy Dwi Heri Suprijanto Hidayat, Muhammad Nurjati Hidayatulloh, Ahmad Yusuf Irenne Ismayanti Romadona Jadfan Sidqi Fidari Kiki Windi Safitri Kistanti, Ida Fitri Komala Candra, Yoggi Fracasnofa Kurniawan, Dita Cahya Linda Prasetyorini Listyana, Kurnia Ulfi Lu'luil Maknun Lufti Akbar M. Amar Sajali M. Janu Ismoyo M. Latiefudin Taruna Pratama Manalu, Marchell Geovande Marsudi, Suwanto Megantoro, Chrisnada Virgiawan Misbachussudur, Mochamad Moh. Sholichin Mohammad Bisri Muchammad Zidan Muhammad Azhar Thirafi Say Muhammad Fahmi Fawji Muhammad iqbal Muhammad, Aminulloh Muhammad, Dien Azmi Nur Sholawatini Nurjati Hidayat, Muhammad Pangestika, Erina Riski Pitojo Tri Juwono Pitojo Tri Juwono Pramudya, Rafi Rizky Pratama, Ivan Kurnia Putra, Boy Adi Qodriah Dianasari qoidulhaq, fayyadh Rachmat, Alvian Rahman, Muhammad Adhia Rahmi, Nuri Aisyah Raya Abdullah Resmani, Eva Reza Indra Rispiningati, Rispiningati Riyanto Haribowo Riyanto Haribowo Rosamike, Mega Okvita Karinda Runi Asmaranto Sholawatini, Nur Sholichin, Moh. Sovereign, Sefaca Markchel Sri Wahyuni Sri Wahyuni Sulthon Arsyad Aifudin Sumiadi, Sumiadi Suwanto Marsudi Suwanto Marsudi Suwanto Marsudi Syafiq, Gilang Ussy Andawayanti Ussy Andawayanti Very Dermawan Very Dermawan Very Dermawan Wardana, Yoga Okta Wicaksana, Chandra Yoga Wicaksono, Dadang Teguh Wijayanto, Achsin Yusron, Vidia Fitri Amalia Zakariya, Ahmad Fatah