Claim Missing Document
Check
Articles

Found 22 Documents
Search
Journal : Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS)

ANALISA STABILITAS CHECKDAM PABYONGAN DESA MULYOSARI KECAMATAN PAGERWOJO KABUPATEN TULUNGAGUNG Jarno Sutikno; Ahmad Ridwan; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol 1, No 1 (2018): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (237.329 KB) | DOI: 10.30737/jurmateks.v1i1.141

Abstract

Checkdam is a control building created due to the presence of water flow with a large enough sediment concentration. Plan to build the Kali Wangi Check dam is one of the flood mitigation efforts that caused severe damage to several drainage structures. Selection of the type of dam is based on the geological conditions of the location where the Check dam is to be built, namely the subgrade in the form of sand, rocky gravel which is also the same on the cliffs, so the type of dam used is the Gravity Type, the pair of river stones with a mixture of 1: 4 outer and The surface is spread with a 1: 2 mixture with a thickness of 2 cm, for the inside using a 1: 3 mixture this mixture is used for the dam and the apron. It is hoped that it can provide a maximum and sturdy function, for that the dam must be subjected to strength control from several aspects, namely control of rolling, shear, soil bearing capacity, and water lifting force on the dam body. From the calculation, it is concluded that the Kali Wangi Check dam is strong withstand the forces acting on it.Checkdam adalah bangunan pengendali yang dibuat karena adanya aliran air dengan konsentrasi sediment yang cukup besar. Rencana pembuatan Checkdam Kali Wangi ini merupakan salah satu usaha penanggulangan banjir yang mengakibatkan kerusakan yang parah pada beberapa bangunan pengaliran. Pemilihan type dam di dasarkan pada kondisi geologi lokasi calon dibangunnya Checkdam, yaitu tanah dasar berupa tanah pasir , kerikil berbatu yang juga sama pada tebing-tebingnya, maka type dam yang dipakai adalah Type Gravitasi, Pasangan batu kali dengan campuran 1 : 4 bagian luar dan permukaan disiar dengan campuran 1 : 2 dengan tebal 2 cm, untuk bagian dalam menggunakan campuran 1 : 3 campuaran ini digunakan untuk bagian dam dan apronnya. Diharapkan dapat memberikan fungsi yang maksimal dan kokoh, untuk itu pada dam harus diadankan pengontrolan kekuatan dari beberapa aspek yaitu kontrol terhadap guling, geser, daya dukung tanah maupun gaya angkat air pada tubuh dam. Dari hasil perhitungan disimpulkan bahwa Checkdam Kali Wangi ini kuat menahan gaya-gaya yang bekerja padanya.
ANALISA PRODUKTIFITAS ALAT BERAT PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS SYARIAH DAN ILMU HUKUM IAIN TULUNGANGUNG Aprilia Kaprina; Sigit Winarto; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.136

Abstract

Heavy equipment is an essential factor in large-scale construction projects. Heavy equipment used in civil engineering is a tool used to assist humans in carrying out development work, and the analysis of the productivity of heavy equipment is calculated so that its use is more efficient in terms of time and operational costs. This project functions as a building for lecture activities, and the land has a total building area of 22,983 m 2. The types of heavy equipment used for earthwork and structural work are excavators, dump trucks, and tower cranes. Based on the results of the calculation of the heavy equipment productivity analysis, which includes earthworks and tower crane work structures, it is obtained the results of research on heavy equipment that are precise, short time. It can be used so that all heavy equipment can work optimally. Of the several combinations, Combination III is the most effective and time-efficient in completing excavation, stockpiling, and tower crane work structures, namely 2 Excavator units, 4 Dumptruck, and 1 Tower Crane. The time needed to do this job is 251.52 hours, with a heavy equipment cost of IDR 276,422,572.00 and the amount of human resource analysis of IDR 9,555,249,830.00. Alat berat merupakan faktor penting di dalam proyek konstruksi berskala besar. Alat berat yang digunakan dalam ilmu teknik sipil adalah alat yang digunakan untuk membantu manusia dalam melakukan pekerjaan pembangunan dan diperhitungkan analisa produktifitas alat berat agar penggunaannya lebih efisiensi dari segi waktu dan biaya operasionalnya. Proyek ini berfungsi sebagai bangunan tempat untuk aktifitas perkuliahan dan tanah memiliki luas total bangunan sebesar 22.983 m 2 . Jenis alat berat yang digunakan untuk pekerjaan tanah dan pekerjaan struktur ialah Excavator, Dumptruck, dan Tower Crane. Berdasarkan hasil perhitungan analisa produktifitas alat berat yang meliputi pekerjaan pekerjaan tanah dan pekerjaan struktur kerja tower crane diperoleh hasil penelitian alat berat yang tepat, waktu yang singkat dan dapat digunakan agar seluruh alat berat dapat bekerja optimal. Dari beberapa kombinasi, di Kombinasi III yang paling efektif dan efisien waktu pelaksanaannya dalam menyelesaikan pekerjaan galian, timbunan dan pekerjaan struktur kerja tower crane yaitu 2 unit Excavator, 4 Dumptruck, dan 1 Tower Crane. Waktu yang dibutuhkan untuk melakukan pekerjaan tersebut adalah 251,52 jam dengan biaya alat berat sebesar Rp 276.422.572,00 dan jumlah analisa sumber daya manusia sebesar Rp 9.555.249.830,00.
STUDI EFISIENSI PEMBERIAN AIR IRIGASI PADA DESA GROMPOL, KECAMATAN GAMPENGREJO, KABUPATEN KEDIRI Wahyu Tri Cahyono; Yosef Cahyo Setianto Purnomo; Sigit Winarto
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.137

Abstract

To increase agricultural productivity and food security, the fulfillment of water has an important role. The agricultural land in Grompol Village utilizes a surface water irrigation network using water from the Waru Turi weir. This study aims to categorize how good the irrigation network is in Grompol Village and the level of efficiency of providing water in the rice fields. This study uses a quantitative approach to the survey type. From the research results at this time, the Waru Turi weir is still considered capable of meeting irrigation needs. In the irrigation channel, Gp 1 KN has an irrigation area of 62 Ha and has a length of 493 m irrigation canal has efficient irrigation of 90.91%. While the GP 4 irrigation channel has an area of 181 hectares of rice fields and 2803 hectares of irrigation channel length, the GP 4 building is divided into 3 branches, namely GP 4 right, GP 4 middle, and GP 4 left, which has a channel efficiency rate of 75.22% for GP 4 KN and 76.74% for the left. GP 3 to GP 4 channels are filled with sediment and weeds so that they look poorly maintained. Peningkatan produktivitas pertanian dan ketahan pangan, pemenuhan akan air mempunyai peran penting. Lahan pertanian di Desa Grompol memanfaatkan jaringan irigasi air permukaan menggunakan air dari bendung Waru Turi. Penelitian bertujuan untuk mengkategorikan seberapa baik jaringan irigasi di Desa Grompol dan tingkat efisiensi pemberian air pada area persawahan. Penelitian ini menggunakan pendekatan kuantitatif jenis survey. Dari hasil penelitian pada saat ini bendung Waru Turi masih dianggap mampu mencukupi kebutuhan irigasi. Pada saluran irigasi Gp 1 kn memiliki area irigasi seluas 62 Ha dan memeiliki Panjang saluran irigasi 493 m mempunyai efisien pengairan sebesar 90,91%. Sedangkan saluran irigasi GP 4 memiliki baku sawah seluas 181 Ha dan Panjang saluran irigasinya 2803 Ha, pada bangunan GP 4 dibagi menjadi 3 cabang yaitu GP 4 kanan, GP 4 tengan dan GP 4 kiri. Yang memiliki tingkat efisien saluran sebesar 75,22% untuk GP 4 kn dan 76,74% untuk kiri. GP 3 sampai GP 4 saluran dipenuhi endapan dan tanaman liar sehingga terlihat kurang terawat.
PEMANFAATAN SERBUK KACA DARI JENIS KACA BENING DENGAN KETEBALAN 3-4 MM SEBAGAI BAHAN TAMBAH DALAM PEMBUATAN BATAKO Ali Syafi’urroziq; Yosef Cahyo Setianto Purnomo; Lucia Desti Krisnawati
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.139

Abstract

Batako is a building material to replace brick, which is composed of sand, portland cement, and water. This type of research is an experimental study in the form of compressive strength testing with the addition of glass powder. We are planning a mixture of brick making materials with a ratio of 1: 6 cement and sand. Making the test object size and external appearance and testing the absorption capacity using a mortar specimen measuring 5 x 5 x 5 cm. Variations in adding glass powder by reducing the amount of sand starting from 0%, 10%, 15%, 20%, and 25% of the weight of the sand. Testing of the mechanical properties of the brick was carried out at the age of 7, 14, and 28 days for the compressive strength test of the brick, and 28 days for the absorption test of the brick. The compressive strength of the concrete blocks increases with age. From the test, it was concluded that the most optimum mixture was the concrete block with a mixture concentration of 25%, namely 58.00 kg / cm² for the results of the concrete block compressive strength test and 11.19 grams for the brick absorption test.Batako merupakan bahan bangunan pengganti batu bata yang tersusun dari pasir, semen portland dan air. Jenis penelitian ini adalah penelitian eksperimen berupa pengujian kuat tekan dengan penambahan serbuk kaca. Perencanaan campuran bahan penyusun batako dengan perbandingan 1 : 6 semen dan pasir. Pembuatan benda uji ukuran dan tampak luar dan pengujian daya serap menggunakan benda uji mortar ukuran 5 x 5 x 5 cm. Variasi penambahan serbuk kaca dengan mengurangi jumlah pasir mulai dari 0%, 10%, 15%, 20%, dan 25% dari berat pasir. Pengujian sifat mekanik batako dilakukan pada umur 7, 14, dan 28 hari untuk uji kuat tekan batako, dan 28 hari untuk uji penyerapan batako. Kuat tekan batako meningkat seiring dengan bertambahnya umur. Dari pengujian disimpulkan bahwa campuran yang paling optimum adalah batako dengan konsentrasi campuran 25% yaitu 58.00 kg/cm² untuk hasil uji kuat tekan batako dan 11.19 gram untuk uji serapan batako.
ANALISA STABILITAS CHECKDAM PABYONGAN DESA MULYOSARI KECAMATAN PAGERWOJO KABUPATEN TULUNGAGUNG Jarno Sutikno; Ahmad Ridwan; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.141

Abstract

Checkdam is a control building created due to the presence of water flow with a large enough sediment concentration. Plan to build the Kali Wangi Check dam is one of the flood mitigation efforts that caused severe damage to several drainage structures. Selection of the type of dam is based on the geological conditions of the location where the Check dam is to be built, namely the subgrade in the form of sand, rocky gravel which is also the same on the cliffs, so the type of dam used is the Gravity Type, the pair of river stones with a mixture of 1: 4 outer and The surface is spread with a 1: 2 mixture with a thickness of 2 cm, for the inside using a 1: 3 mixture this mixture is used for the dam and the apron. It is hoped that it can provide a maximum and sturdy function, for that the dam must be subjected to strength control from several aspects, namely control of rolling, shear, soil bearing capacity, and water lifting force on the dam body. From the calculation, it is concluded that the Kali Wangi Check dam is strong withstand the forces acting on it.Checkdam adalah bangunan pengendali yang dibuat karena adanya aliran air dengan konsentrasi sediment yang cukup besar. Rencana pembuatan Checkdam Kali Wangi ini merupakan salah satu usaha penanggulangan banjir yang mengakibatkan kerusakan yang parah pada beberapa bangunan pengaliran. Pemilihan type dam di dasarkan pada kondisi geologi lokasi calon dibangunnya Checkdam, yaitu tanah dasar berupa tanah pasir , kerikil berbatu yang juga sama pada tebing-tebingnya, maka type dam yang dipakai adalah Type Gravitasi, Pasangan batu kali dengan campuran 1 : 4 bagian luar dan permukaan disiar dengan campuran 1 : 2 dengan tebal 2 cm, untuk bagian dalam menggunakan campuran 1 : 3 campuaran ini digunakan untuk bagian dam dan apronnya. Diharapkan dapat memberikan fungsi yang maksimal dan kokoh, untuk itu pada dam harus diadankan pengontrolan kekuatan dari beberapa aspek yaitu kontrol terhadap guling, geser, daya dukung tanah maupun gaya angkat air pada tubuh dam. Dari hasil perhitungan disimpulkan bahwa Checkdam Kali Wangi ini kuat menahan gaya-gaya yang bekerja padanya.
STUDI PENANGGULANGAN BANJIR DI KALI BATAN KABUPATEN KEDIRI Moch Adib Kuncoro; Sigit Winarto; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.143

Abstract

Kali Batan is one of the tributaries of the Brantas River, which is located in the Kediri Regency. In the last few years, there have been floods in Kali Batan. In the Batan watershed, there are three stations that are considered to represent the percentage of the effect of the calculation of the maximum daily rainfall intake, which is 83.11mm. From the maximum daily rainfall, the result is-0.9546. From the calculations in the Smirnov-Kolmogorov method distribution suitability test, it shows that the highest value of Δmax is = 0.126, with α = 5% and n = 20, the value Δcritical = 0.304. So it can be concluded that Δmax <Δcritical so that the Log Pearson type III distribution can be accepted. From the measurement of the Batan watershed at the upstream review point, the result is 3.206 m3 / s. From the measurement of the Kali Batan watershed at the downstream point, the results obtained were 202.475, using equations (2-14) to (2-17), the design flood hydrograph obtained 3,825 m3 / s. The value of the net rainfall intensity value (25 years ) entered into the coordinates of the Nakayasu Synthetic Hydrograph, then the flood discharge design Q25th is obtained.Kali Batan merupakan salah satu anak sungai Kali Brantas yang terletak di Kabupaten Kediri. Beberapa tahun terakhir terjadi banjir di Kali Batan.  Pada DAS Batan terdapat tiga stasiun penakar hujan yang dianggap mewakili dengan prosentase pengaruh perhitungan pengambilan curah hujan harian maksimum didapatkan sebesar 83,11mm. Dari curah hujan harian maksimum didapatkan hasil- 0,9546. Dari perhitungan pada Uji kesesuaian distribusi metode Smirnov-Kolmogorov menunjukkan bahwa nilai tertinggi Δmax adalah = 0,126, dengan α = 5 % dan n = 20 didapatkan harga Δkritis = 0,304. Maka dapat disimpulkan bahwa Δmax< Δkritis sehingga distribusi Log Pearson tipe III dapat diterima.  Dari pengukuran DAS Batan pada titik tinjau hulu didapatkan hasil3,206 m3 /dt. Dari pengukuran DAS Kali Batan pada titik hilir didapatkan hasil202,475, denganmenggunakan persamaan-persamaan (2-14) sampai dengan (2-17), hidrograf banjir rancangan diperoleh 3,825 m3 /dt.Besarnya nilai intensitas curah hujan netto (kala ulang 25 th) dimasukkan ke dalam koordinat Hidrograf Sintetis Nakayasu maka didapatkan debit banjir rancangan Q25th.
STUDY ANALISA VOLUME KENDARAAN PADA SIMPANG BERSINYAL DI PEREMPATAN ALUN ALUN KOTA KEDIRI Rezha Yuwono; Yosef Cahyo Setianto Purnomo; Lucia Desti Krisnawati
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.144

Abstract

Adequate transportation facilities are very influential in the economy. One of the intersections in the city of Kediri is controlled by means of a traffic signal (APILL). In line with the current increase in traffic volume, it is necessary to study the traffic light settings at these intersections. The geometry at the analysis site is at the intersection of north, south, east, west COM type road environment. Daily Traffic Volume (LHR) is 608,302 pcs / hour. Based on the results of the analysis and performance evaluation, it can be concluded that the results of the intersection calculation indicate the existing conditions of analysis based on MKJI 1997. An idealization of the traffic light setting program, the field conditions are proven to be appropriate (feasible), namely the optimum cycle of morning peak Co = 60 seconds, and afternoon peak Co = 75 seconds is still in the range Co = 80 - 130 seconds for the 4-phase control type based on MKJI 1997. The average delay value of morning peak intersection = 38.27 seconds /pcu with LOS D. Evening peak, the average delay of intersection = 38.32 seconds / junior high school with LOS D.Sarana transportasi yang memadai sangat berpengaruh bagi perekonomian. Salah satu persimpangan di kota kediri dikendalikan dengan alat pemberi isyarat lalu lintas (APILL). Seiring dengan peningkatan volume lalu lintas saat ini, perlu dikaji setting traffic light pada simpang tersebut. Geometri Pada lokasi analisa pada kaki persimpangan utara, selatan, timur, barat tipe lingkungan jalannya COM. Volume Lalu Lintas Harian (LHR) adalah 608,302 smp/jam. Berdasarkan hasil analisa dan evaluasi kinerja dapat disimpulkan bahwa pada hasil perhitungan simpang bersinyal kondisi eksisiting analisa berdasarkan MKJI 1997. Secara idealisasi progam setting traffic light kondisi lapangan terbukti sudah sesuai (layak), yaitu siklus optimum puncak pagi Co = 60 detik, dan puncak sore Co = 75 detik masih berada di range Co = 80 - 130 detik untuk tipe kontrol 4 fase berdasarkan MKJI 1997. Nilai tundaan rata-rata simpang puncak pagi = 38,27 detik/smp dengan LOS D. Puncak sore tundaan ratarata simpang = 38,32 detik/smp dengan LOS D.
KAJIAN JEMBATAN KECAMATAN SENDANG (RUAS JALAN TUGU – PABYONGAN) KABUPATEN TULUNGAGUNG DENGAN METODE KOMPOSIT Tri Yuli Purnomo; Lucia Desti Krisnawati; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.145

Abstract

Population growth in Tulungagung Regency, which is getting faster, must be balanced with adequate transportation infrastructure. Improvement of transportation facilities and infrastructure is in the form of bridge construction. In order to achieve good and truly mature planning, a careful feasibility study is required. From the results of research on the Sendang Bridge (Tugu - Pabyongan Road Section), the greatest force acting on the bridge includes: ultimate moment of support = 34.7 kNm and the ultimate moment of field = 23.8 kN, dead load = 101.12 kNm , live load = 11.09 kN / m, load 'D' = 304.73 kNm, load 'T' = 130 kN, brake load = 45.93 kNm, wind load = 14.70 kNm, earthquake load = 1, 1 kN / m. From the existing loading, a bridge plate with a thickness of 0.2 m is determined. The controls used were deflection requirements d <Ls / 240. 0.0313 <10.8 / 240 → OK, control voltage kip f = 16.77 Mpa. The girder profile is used WF 400.200.8.13. By calculating the structural load and the force acting on the bridge, the use of girder profile is safe to accept stress and deflection due to the forces on the upper structure.Pertumbuhan penduduk di Kabupaten Tulungagung yang semakin pesat harus diimbangi dengan sarana prasarana transportasi yang memadai. Peningkatan sarana dan prasarana transportasi ini berupa pembangunan jembatan. Untuk mencapai perencanaan yang baik dan benar-benar matang maka diperlukan studi kelayakan yang teliti. Dari hasil penelitian pada Jembatan Sendang (Ruas Jalan Tugu – Pabyongan) dihasilkan Gaya yang terbesar yang bekerja pada jembatan meliputi : momen ultimite tumpuan sebesar = 34,7 kNm dan momen lapangan ultimit sebesar = 23,8 kN, beban mati = 101,12 kNm ,beban hidup = 11,09 kN/m, beban ‘D’ = 304,73 kNm, beban ‘T’ = 130 kN, beban rem = 45,93 kNm, beban angin = 14,70 kNm, beban gempa =1,1 kN/m. Dari pembebanan yang ada ditentukan Plat jembatan setebal 0,2 m. Kontrol – kontrol yang di gunakan syarat lendutan d < Ls/240. 0,0313< 10,8/240 →OK , kontrol tegangan kip f = 16,77 Mpa. Profil gelagar digunakan WF 400.200.8.13 , dengan perhitungan beban struktur dan gaya yang bekerja pada jembatan, penggunaan profil gelagar tersebut aman menerima tegangan dan lendutan akibat gaya-gaya pada struktur atas.
STUDY PERENCANAAN PONDASI TIANG PANCANG JEMBATAN SEMBAYAT BARU II KECAMATAN MANYAR, KABUPATEN GRESIK Feri Febriantoro; Yosef Cahyo Setianto Purnomo; Ahmad Ridwan
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.147

Abstract

The foundation is a building medium that functions as a load bearer for the upper structure to the soil layer. The implementation method used for the first time is to carry out preparation activities, data collection, observation, data processing/planning of the bearing capacity of the pile based on Sondir data according to the literature of Ir. Sardjono and determine the bearing capacity of the pile and the axial bearing capacity based on the N-SPT data from the Meyerhof method. The analysis obtained from the study of the Sembayat Baru II Bridge project in Manyar District, Gresik Regency, is to use a Spun Pile with a diameter of 50 cm, which is able to withstand loads of up to 10572.66 KN. Based on the Converse-Labarre theory, the value of the efficiency coefficient (Ce) for solid sand is 0.7 (for S = Ø 3 - 6. Ø). After controlling the pile group on the planned pile group arrangement, the value was 0.7. Then the planned group arrangement (Safe). In the calculation of the value of lateral force control, according to Broms (1964), a theory is 4.69 more than the standard value (3), which can be declared Safe.Pondasi merupakan sebuah media bangunan yang berfungsi sebagai pemikul beban struktur atas menuju lapisan tanah. Metode pelaksanaan yang digunakan pertama kali adalah melakukan kegiatan persiapan, pengumpulan data, observasi, olah Data/Perencanaan daya dukung tiang berdasarkan Data Sondir sesuai literatur Ir. Sardjono dan menentukan kapasitas daya dukung tiang pancang beserta daya dukung aksial berdasarkan data N-SPT dari metode Meyerhof. Analisa yang diperoleh dari study proyek Jembatan Sembayat Baru II di Kecamatan Manyar, Kabupaten Gresik adalah menggunakan Spun Pile dengan diameter 50 cm yang mampu menahan beban hingga 10572,66 kn. Berdasarkan teori Converse – Labarre harga koefisien efisiensi (Ce) untuk pasir padat adalah 0,7 (untuk S = Ø 3 – 6 . Ø). Setelah dilakukan kontrol kelompok tiang pada susunan kelompok tiang yang direncanakan didapatkan nilai sebesar 0,7. Maka susunan kelompok yang direncanakan (Aman). Pada perhitungan nilai kontrol gaya lateral menurut teori Broms (1964) yaitu 4,69 lebih dari nilai standard (3) yang dapat dinyatakan Aman.
PEMANFAATAN LIMBAH HASIL PEMBUATAN ANYAMAN BERBAHAN BAMBU SEBAGAI CAMPURAN STANDARD MIXDESIGN PAVING BLOCK Amanda Rizky Fauzy; Arthur Daniel Limantara; Yosef Cahyo Setianto Purnomo
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 1 No. 1 (2018): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v1i1.161

Abstract

Exploitation of stone use as the main component of concrete needs to be reduced. The presence of alternative rough aggregate substitute in concrete mixture needs to be applied. This research aims for the optimum percentage of the percentage of value of the addition of waste fibre woven bamboo to achieve a strong press of minimum and magnitude of absorption percentage. This research was conducted in Civil Engineering Laboratory of Kadiri University using trial and error method, sample used in cube dimension 15 x 15 x 15 cm with 20 pieces with planned quality K-225 or 18.675 MPa. Comparison of percentage of based on rough aggregate volumes on the mix of paving blocks. Compessive strength test at 28 days. The results showed Compessive strength on the bamboo fiber variation 0%, 5%, 15% and 25% for 20.7 MPa, 17.6 MPa, 12.3 MPa and 9.9 MPa obtained the optimum fibre woven bamboo percentage of in accordance with minimum limit of strong standard press paving block 17 MPa by 7%. The absorption test results showed an increase that was directly proportional to the percentage of the variation of the addition with an average of 0.1%, 0.1%, 0.2% and 0.3%, with optimal absorption of 0.103%.Eksploitasi penggunaan batu sebagai komponen utama beton perlu direduksi. Adanya alternatif pengganti agregat kasar dalam campuran beton perlu diterapkan. Penelitian ini dilakukan untuk mencari nilai prosentase optimum penambahan serat limbah anyaman bambu agar mencapai kuat tekan minimal serta besarnya prosentase penyerapan. Penelitian ini dilakukan di Laboratorium Teknik Sipil Universitas Kadiri menggunakan metode trial and error, sample yang digunakan berbentuk kubus dimensi 15 x 15 x 15 cm sebanyak 20 buah dengan mutu yang direncanakan K-225 atau 18,675 MPa. Perbandingan prosentase subtitusi berdasarkan volume agregat kasar pada campuran paving block. Pengujian kuat tekan dilakukan pada umur 28 hari. Hasil pengujian menunjukkan kuat tekan rata-rata pada variasi serat bambu 0%, 5%, 15% dan 25% sebesar 20,7 MPa, 17,6 MPa, 12,3 MPa dan 9,9 MPa sehingga didapatkan prosentase serat limbah anyaman bambu optimum sesuai batas minimal standar kuat tekan paving block 17 MPa sebesar 7%. Hasil uji absorpsi menunjukkan peningkatan yang berbanding lurus dengan prosentase variasi penambahan dengan rata-rata sebesar 0,1%, 0,1%, 0,2% dan 0,3%, dengan penyerapan optimum sebesar 0,103%.