Journal : Jurnal Teknik Industri Terintegrasi (JUTIN)

Usulan Perbaikan Fasilitas Kerja Ergonomis Berdasarkan Hasil Analisis Metode REBA pada Stasiun Pengemasan Bale Dicinta, Mutiara; Christata, Bellachintya Reira; Kristyanto, Bernadus
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 3 (2025): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i3.45862

Abstract

PT. XYZ is a manufacturing company that produces cigarettes. There is a workstation that is still done manually, namely the packaging section. Work that is done manually can pose a risk to occupational health and safety. Initial observations show that every day there are workers who are absent due to fatigue and illness. Inappropriate working posture can cause fatigue and health problems. Analysis of the risk level of work posture using the REBA method. The results of the analysis of work posture with REBA showed scores of 5, 10, and 7 for each type of bale packaging work. This score indicates a high level of risk and the need for improvement in work posture. Improvement of work posture in this study was carried out by redesigning ergonomic work facilities with an anthropometry approach. Analysis using the REBA method was also carried out for work posture in the proposed work facility design with simulation. The results of the analysis showed a decrease in risk as indicated by REBA scores of 3, 6, and 5 for each type of bale packaging work.
Perbaikan Keseimbangan Lintasan Lini Produksi Dengan Metode Ranked Positional Weight (RPW) untuk Meningkatkan Efisiensi Christata, Bellachintya Reira; Majid, Syahrul; Asri, Vikha Indah
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 4 (2023): Oktober
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i4.18245

Abstract

XYZ is an electronics company that requires an efficient and timely production process to meet market demand. One way to increase production efficiency is to improve the production line. Currently the company is faced with production problems, namely the existence of unbalanced work groups which have a balance loss value of up to 61%. Therefore, this study tries to solve these problems using the RPW method. The RPW (Ranked Positional Weight) method is a track balancing method by establishing a work station based on the weight of each operation. Where the highest weight becomes the first order in the formation of work stations. From the results of calculations using the RPW, the number of work activity groupings is less, namely as many as 10 work stations. The work station generated using the RPW method has a track efficiency level of 96% with a balance delay value of 4%. This means that the grouping of proposed work activities has a more efficient trajectory balance than the previous grouping of work activities..