Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : Jurnal Kridatama Sains dan Teknologi

Pengendalian Biaya dan Waktu dengan Metode Earned Value pada Proyek Pembangunan Hotel Citra Dream Blok III Bintaro Tanggerang Selatan HP, Lilik Setyawan; Wicaksono, Damar Adjie; Slameto, P Joko; Dimyati, Dimyati; Pramono, Didiek; Susanto, Remigius Hari
Jurnal Kridatama Sains dan Teknologi Vol 6 No 02 (2024): JURNAL KRIDATAMA SAINS DAN TEKNOLOGI
Publisher : Universitas Ma'arif Nahdlatul Ulama Kebumen

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53863/kst.v6i02.1376

Abstract

Delays in project implementation often occur, therefore it is necessary to carry out control on the project so that its implementation can be carried out again according to the time and cost that have been determined. Control was carried out on the Citra Dream Hotel Development Project, Block III Bintaro. The planned implementation time at that stage was 560 days. Acceleration was carried out using the Earned Value method. The yield value method is a control method used to control project costs and schedules. This method provides information on project performance in a reporting period and provides information on the predicted costs required and the time required to complete all work based on performance indicators at the time of reporting. In the Citra Dream Hotel Development Project, Block III Bintaro, the BCWS (Budget Cost of Work Schedule) value was obtained = Rp. 2,517,673,147,940.23, the BCWP (Budget Cost of Work Performance) value = Rp. 2,441,825,773,572.85, the ACWP (Actual Cost of Work Performance) value = Rp. 2,342,994,346,366.87, based on the schedule aspect, this project is delayed, this is proven by the SV (Schedule Variance) value = -Rp. 919,362,113.54 and SPI (Schedule Performance Index) = 0.97 <1. Based on the acceleration management that has been carried out to accelerate the project by adding overtime hours for 2 hours. The addition of overtime hours can save the project duration by up to 9 days