Pengaruh Keselamatan Dan Kesehatan Kerja Dalam Pelaksanaan Pembangunan Pengaman Abrasi Pantai Mampie Kecamatan Wonomulyo Rizaldi, Muhammad Rizky; Abduh, Muhammad Natsir; Yunus, Ahmad Yauri
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 2 No. 2 (2024): Jurnal Penelitian Teknik Sipil Konsolidasi, Mei 2024
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56326/jptsk.v2i2.3330

Abstract

This study aims to analyze the factors that affect Occupational Health and Safety (K3) in the implementation of the construction of campie beach abrasion safety This study used quantitative methods with a descriptive approach with a total of 51 respondents. Instrument testing uses validity tests and reliability tests. While the data analysis method uses multiple linear regression with F test and t test. The results showed that the variables Workload (X1), Working Capacity (X2) and Work Environment (X3) simultaneously affect occupational safety and health (Y) in the implementation of the construction of mampie beach abrasion safety. From the calculation of the F test, F is obtained calculate 24.988 > F Table 2.73 with a sig value of 0.000 < 0.05. Based on the t test, the variables workload (X1) 2,205, working capacity (X2) 4,783, and work environment (X3) 6,612 have a positive and significant effect on occupational safety and health (Y).  In addition, the Adjusted R Square value of 0.605 which means the magnitude of the influence of the independent variable on the dependent variable is 60.50%.
Tinjauan Perbandingan Rencana Anggaran Biaya Dan Waktu Pelaksanaan Pembangunan Gedung Fakultas Kedokteran Universitas Bosowa Makassar Umar, Zukry; Abduh, Muhammad Natsir; Mullyani, Savitri Prasandi
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 3 No. 3 (2025): Jurnal Penelitian Teknik Sipil Konsolidasi, September 2025
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56326/jptsk.v3i3.3201

Abstract

In the world of construction, project management has an important role such as determining the budget planning and implementation time, its function is to find out how much budget is needed and how long it takes. In order to facilitate implementation in the field. In this study there are two methods used, namely the method based on the Regulation of the Minister of Public Works and Public Housing Number 28 of 2016 and the method based on the Regulation of the Minister of Public Works and Public Housing Number 1 of 2022. This study is a re-examination of the actual calculation using the method Regulation of the minister of public works and public housing number 28 of 2016. From the results of the comparison of the budget plan for the construction of the Faculty of Medicine, University of Bosowa Makassar, which has been made by PT. Seven Guardians of (Rp. 24.008.000.000) with a duration of work for 483 days and made by the author of Rp. 23. 511. 000 000. with a duration of work for 434 days.