cover
Contact Name
Nizirwan Anwar
Contact Email
nizirwan.anwar@esaunggul.ac.id
Phone
+6281342713802
Journal Mail Official
nadzirin@gmail.com
Editorial Address
Jl. H.E.A. Mokodompit, Kampus Baru Anduonouhu, Kendari, Sulawesi Tenggarai 93232 - Indonesia.
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
Fokus Elektroda: Energi Listrik, Telekomunikasi, Komputer, Elektronika dan Kendali)
Published by Universitas Esa Unggul
ISSN : 25025562     EISSN : 25025562     DOI : dx.doi.org/10.33772/jfe
Jurnal Fokus Elektroda (Energi Listrik, Telekomunikasi, Komputer, Elektronika dan Kendali) Cakupan pada bidang Energi Listrik Telekomunikasi Komputer Elektronika dan Kendali Robotik Informatika Smart City Multimedia
Articles 5 Documents
Search results for , issue "Vol 5, No 1 (2020): Jurnal Elektroda Vol 5 No 1" : 5 Documents clear
Analisis Tahanan Pembumian pada Elektroda Pelat Menggunakan Soil Treatment Bentonit dan Arang Tempurung Kelapa Kansil, Fiani; Musaruddin, Mustarum; Djohar, Abdul
Jurnal Fokus Elektroda : Energi Listrik, Telekomunikasi, Komputer, Elektronika dan Kendali) Vol 5, No 1 (2020): Jurnal Elektroda Vol 5 No 1
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jfe.v5i1.11652

Abstract

Sistem pembumian berfungsi untuk membuang arus lebih ke dalam tanah atau bumi, sehingga dapat mengamankan manusia dari gangguan listrik. Penelitian ini dilakukan untuk mengetahui penurunan tahanan pembumian jika diberi soil treatment bentonit, arang tempurung kelapa, dan pasir. Metode pengukuran yang digunakan adalah metode tiga titik dan  menggunakan elektroda pelat tembaga panjang 30 cm, lebar 30 cm dan tebal 0,8 mm pada kedalaman 1 m. Hasil penelitian nilai tahanan pembumian tanpa perlakuan  masing-masing sebesar 561 Ω, 559 Ω dan 561 Ω. Setelah penambahan arang tempurung kelapa nilai tahanan pembumian sebesar 90,97 Ω, penambahan bentonit nilai tahanan pembumian sebesar 18,97 Ω dan penambahan pasir nilai tahanan pembumian adalah 126,9 Ω.Kata kunci — arang tempurung kelapa, bentonit, pasir, elektroda pelat, tahanan pembumian.
STUDY PEMELIHARAAN KOMPONEN JARINGAN DISTRIBUSI DENGAN PEKERJAAN DALAM KEADAAN BERTEGANGAN (PDKB) UNTUK KEANDALAN SISTEM 20 KV PADA PLN UP3 KENDARI Galugu, Indrayati; Jie, Samuel; Fikri, Laode Rausyanul
Jurnal Fokus Elektroda : Energi Listrik, Telekomunikasi, Komputer, Elektronika dan Kendali) Vol 5, No 1 (2020): Jurnal Elektroda Vol 5 No 1
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jfe.v5i1.11659

Abstract

Listrik merupakan kebutuhan pokok bagi sebagian manusia di dunia, dengan adanya listrik maka perputaran perekonomian di dunia menjadi lancar. Seiring dengan perkembangan zaman dan semakin banyaknya konsumen tenaga listrik maka di harapkan listrik dapat tersalur kepada pelanggan secara terus-menerus tanpa terhenti. Dalam penyaluran listrik seringkali dihadapkan dengan berbagai macam gangguan yang menyebabkan listrik padam. Olehnya itu PLN membentuk pekerja pemeliharaan dalam keadaan bertegangan (PDKB) yang bertugas melakukan pemeliharaan komponen listrik tanpa padam sehingga listrik dapat tersalur secara terus menerus. Dengan adanya PDKB dapat menguntungkan dari sisi Perusahaan dan Pelangan. Diman untuk perusahaan dan pelanggan. Pada penelitian ini di dapatkan saving sebesar 143.900 kwh dan saving rupiah sebesar Rp. 171.094.222 SAIDI 52,354 menit/pelanggan dan SAIFI Sebesar 0,518 kali/pelanggan.Kata Kunci : PDKB, Saving Kwh, SAIDI SAIFI
PEMODELAN DAN SIMULASI SKEMA PELEPASAN BEBAN DENGAN RELE FREKUENSI RENDAH SISTEM KELISTRIKAN DI PT. PLN (PERSERO) KOTA KENDARI Sartisya, Risya; Hay, Sahabuddin; Siti Nur Alam, Wa Ode
Jurnal Fokus Elektroda : Energi Listrik, Telekomunikasi, Komputer, Elektronika dan Kendali) Vol 5, No 1 (2020): Jurnal Elektroda Vol 5 No 1
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jfe.v5i1.12334

Abstract

The deviation of the frequency of a power system from its nominal value is a reflection of the mismatch between generation and load. Such deviation are serious and must be monitored and controlled very closely. One major impact of operation outside a narrow range around the nominal frequency is that generators can demaged. To avoid this, manufacturers set time interval limits for under-frequency operation and when such limits are exceeded, the generator trips. Howeever, unless generator tripping is coordinated with some accompanying load shedding, the system inablitiy to supply its load can be exacerbated resulting in an even worse frequency deviation.Under-frequency load shedding (UFLS) is designed to protect the power system from event leading to a sudden drop in system frequency, when the primary frequency regulation built into the generation system is not enough to bring the frequency back to nominal. Under-frequency load shedding disconnect blocks of load when the frequency drop below given threshold. This study aims to model and simulate each stage of the shed of the load that is in the electrical system of the city of Kendari using low frequency relays and assess the effectiveness of each stage to return the system frequency and voltage to the value that is still permitted.The results showed that the simulation of each stage of load release with the help of DigSilent Power Factory 10.1.7 software was able to minimize the amount of outages, and was able to restore the System frequency when the frequency was minimal due to the sudden loss of power suppliers(generator). The frequency recovery rate of the study shows the release of loads starting from 2.57 MW - 3.33 MW frequency recovery from 49.4 Hz - 50.00 Hz.Keywords: Frequency and Voltage, Loss generator, Under-Frequency Load Shedding.
Analisa Path loss Radio Jaringan 5G frekuensi High band 26 GHz dengan Model 3GPP ETSI Alfaresi, Bengawan; Barlian, Taufik; Muhardanus, Muhardanus
Jurnal Fokus Elektroda : Energi Listrik, Telekomunikasi, Komputer, Elektronika dan Kendali) Vol 5, No 1 (2020): Jurnal Elektroda Vol 5 No 1
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jfe.v5i1.10689

Abstract

Perkembangan jaringan 5G beroperasi pada 3 layer frekuensi yaitu jaringan lower band, middle band dan high band. Penggunaan frekuensi high band menjawab semua tantangn pada jaringan 5G dalam hal jaringan pita lebar. Pada penelitian ini menganlisa path loss pada frekuensi high band dengan menggunakan model 3GPP ETSI. Simulasi yang dilakukan dengan menggunakan software Matlab v.2016. Hasil penelitian menyatakan bahwa parameter jarak dan frekuensi sangat berpengaruh pada besar path loss yang dihasilkan, sedangkan parameter tinggi BTS dan tinggi penerima, berpengaruh sebagian yaitu tinggi BTS dan penerima tidak berpengaruh pada kondisi LOS daerah rural macro dan kondisi NLOS pada urban macro dan micro.Kata kunci — Jaringan 5G, High band, Propagasi, 3GPP, ETSI,
Audit Energi Gedung Laboratorium Fakultas Teknik Universitas Halu Oleo Kendari Yuslin, Laode; Tachrir, Tachrir; Lolok, Agustinus
Jurnal Fokus Elektroda : Energi Listrik, Telekomunikasi, Komputer, Elektronika dan Kendali) Vol 5, No 1 (2020): Jurnal Elektroda Vol 5 No 1
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jfe.v5i1.11420

Abstract

Pelaksanaan audit energi merupakan langkah awal untuk memulai manajemen energi yang baik. Dengan metode audit energi maka akan dihasilkan dan diperoleh data yang real dan konkrit mengenai kondisi beban ataupun peralatan yang ada dan digunakan di suatu gedung, biaya kebutuhan energi dan operasional, serta bagaimana memanajemen energi yang akan dipakai atau digunakan  Adapun tujuan Dapat mengetahui nilai Intensitas Konsumsi Energi Laboratorium Fakultas Teknik UHO dalam pemakain sebulan dan dapat juga mengetahui peluang hemat energi sehingga dapat mengurangi pemakaian energi listrik yang tidak perlu demi menghemat pemakaian energi listrik ,  metode Penelitian ini adalah pengukuran langsung dan observasi lapangan yang diolah dengan Microsoft Excel. hasil pengukuran  langsung di dapat total pemakaian energi selama 1 bulan atau 20 hari pengukuran  sebesar 1455.381427 kwh/m2 dengan  intensittas konsumsi energi  ( ike ) sebesar 0,729  kwh/m2/bulan/8jam dari perhitungan tersebut maka gedung laboratorium fakultas teknik uho masih dalam kategori efisien. untuk hasil observasi lapangan berdasarkan  analisa perhitungan peluang hemat energi ( phe ) ditiga lantai di dapat 6 ruangan yang melebihi standar  intensitas konsumsi energi ( ike ) kategori efisien yang ada  maka didapat potensi penghematan sebesar rp 10.289.051,87 per bulan..Kata kunci — Intensitas Konsumsi Energi ( IKE ) Potensi Hemat Energi ( PHE )

Page 1 of 1 | Total Record : 5