cover
Contact Name
Ardi Mardiana
Contact Email
aim@unma.ac.id
Phone
+6281212777182
Journal Mail Official
stima@unma.ac.id
Editorial Address
Jl. KH. Abdul Halim No. 103 Majalengka, Jawa Barat, Indonesia 45418
Location
Kab. majalengka,
Jawa barat
INDONESIA
SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
Published by Universitas Majalengka
ISSN : 25283820     EISSN : 30260833     DOI : https://doi.org/10.31949/stima
Prosiding SEMINAR TEKNOLOGI MAJALENGKA (STIMA) adalah publikasi ilmiah yang memuat hasil-hasil penelitian orisinal dan terkini dari para akademisi, peneliti, dan praktisi di berbagai bidang teknik dan manajemen. Prosiding ini memiliki sifat multidisiplin, berfokus pada integrasi ilmu pengetahuan dari empat cabang utama: Teknik Industri, Teknik Sipil, Teknik Mesin, dan Informatika.
Articles 60 Documents
Search results for , issue "Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"" : 60 Documents clear
METODE PELAKSANAAN PERKERASAN LENTUR HOT ROLLED SHEET (HRS) PADA PROYEK PEMBANGUNAN GEDUNG CREATIVE CENTER MAJALENGKA Rohendi, Firdha Aulia Agustina; Hendrayana, Yayat
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.865

Abstract

Abstract Practical work is one of the compulsory subjects for civil engineering study program students in accordance with the curriculum at Majalengka University which is one of the requirements for the Final Project. Practical work is observing a field object so that students are expected to have the opportunity to find out about field activities directly and apply them accordingly. with theory and practice learned in college.In this case the author presents a report on submitting practical work on the Creative Center Building Project located in Pujasera, Majalengka District, Majalengka Regency with the title "Method of implementing flexible pavement on the Majalengka Creative Center Building project". This Creative Center building was built for creativity and provides facilities in the form of a Tourist Information Center (ITC), Basketball Court, Amphitheater, Skateboard, Mep Room (Mechanical Electrical and Plumbing, Art Park and Parking Area).In preparing this practical work report, the main discussion that will be carried out is regarding the method of implementing flexible pavement for the Majalengka Creative Center Building project which includes the process and work on the pavement and can better understand the stages of implementation.The use of asphalt as a binder in flexible pavement is very large, so many infrastructures always use asphalt as a material for construction. Keywords : creative center majalengka building construction project, hot rolled sheet (hrs) flexible pavement implementation method
PERANCANGAN SISTEM PENDUKUNG KEPUTUSAN PEMILIHAN GURU BERPRESTASI DENGAN METODE SIMPLE ADDITIVE WEIGHTING (SAW) (Studi Kasus: SMA INFORMATIKA CIAMIS) Rohayati, Tuti; Maulana, Haisyam; Juwita Sari, Deassy Ratna
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.868

Abstract

This research discusses the design of a decision support system for selecting outstanding students using the simple addictive weighting (saw) method in a case study at SMA Informatika Ciamis. The purpose of this research is to facilitate the assessment of outstanding teachers, it is necessary to create a system that is able to provide maximum results and can facilitate the process of selecting outstanding teachers in terms of assessment, data processing and data input. This study uses several relevant theories such as Decision Support Systems. The research method used in this research is the SAW method, the Simple Additive Weighting (SAW) method. In Ciamis Informatics High School as one of the largest private high schools in Ciamis every year an election for outstanding teachers is always held. From previous experience, every selection of outstanding teachers always had problems, including the lack of attention to the weight of the assessment of each of the criteria for evaluating outstanding teachers. The weight of the assessment includes attendance, discipline, professionalism, personality and social.
METODE PELAKSANAAN PEKERJAAN GALIAN DAN TIMBUNAN PADA PROYEK REHABILITASI BENDUNG DAERAH IRIGASI (D.I) TIRTANEGARA KABUPATEN MAJALENGKA Permana, Ikhsan Permana; Toruan, Erni Sari Lumban
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.870

Abstract

Proyek Rehabilitasi Bendung Daerah Irigasi (D.I) Tirtanegara yang berfokus pada pekerjaan rehabilitasi sayap kanan bendung dan saluran irigasi ini dilaksanakan karena intensitas curah hujan tinggi sehingga dihantam banjir sungai setinggi 2,5 m diatas mercu selama 3 hari 3 malam berturut – turut (±60 jam) mengakibatkan sayap hilir kanan bendung ambruk sepanjang ±60 m. Dikhawatirkan jika tidak diperbaiki akan merusak tebing yang berdampak pada amblasnya saluran irigasi Tirtanegara yang mempunyai luas layanan 649 Ha, yang melayani 5 Kecamatan didalamnya ada 14 Desa dan mengakibatkan gagalnya pola tata tanam bagi para petani yang sawahnya dialiri air dari Bendung Daerah Irigasi (D.I) Tirtanegara ini. Adapun metode pelaksanaan pada pekerjaan Rehabilitasi Bendung Daerah Irigasi (D.I) Tirtanegara ‘Pekerjaan Sayap Bendung & Saluran Irigasi’ Kabupaten Majalengka ini seperti pekerjaan persiapan, pekerjaan bowplang, pekerjaan pengecoran dan pekerjan finishing. Kemudian pada rehabilitasi saluran irigasi seperti pekerjaan persiapan, pekerjaan galian, pemasangan batu belah, dan pekerjaan finishing. Demi keberlangsungan metode pelaksanaan pekejaan proyek ini, maka dibutuhkan tahapan-tahapan pekerjaan pada setiap metode pelaksanaan dan perhitungan berfokus pada pekerjaan galian didapatkan total volume 571,50 m³ beserta pekerjaan timbunan sayap bendung sebanyak 4 titik didapatkan total volume 759,38 m³ hingga mobilisasi sumber daya / resource baik peralatan, personil, atau bahan yang digunakan.
SISTEM INFORMASI ANALISIS PLAYER TOURNAMENT MOBILE LEGENDS BERBASIS WEB PBESI MAJALENGKA Agung Pamungkas, Bayu; Zaliluddin, Dadan
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.871

Abstract

This research is motivated by the increasing number of E-Sports users or enthusiasts worldwide, as E-Sports has become an integral part of official sports competitions. Therefore, by creating an information system to process the data from Mobile Legends tournaments, the aim is to make informed decisions in identifying potential athletes who can bring honor to their region or country. In conclusion, this system is developed to provide support for decision-making, provide information related to the E-Sports organization that oversees the E-Sports ecosystem, namely the Indonesian Esports Association (PBESI), and offer prediction features to estimate the likelihood of victory for each player in the competition
ANALISIS FASILITAS DI TERMINAL LEUWI PANJANG, KOTA BANDUNG Siddiq, Raden Herdian Bayu Ash
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.881

Abstract

Leuwi Panjang Terminal is one of the Type A passenger terminals in the city of Bandung. As a type A terminal that functions to serve public passenger vehicles for inter-city inter-provincial transportation (AKAP), and cross-border transportation between countries, inter-city transportation within the province (AKDP), city transportation (AK) and rural transportation (ADES), the terminal Leuwi Panjang must meet service standards for public passenger transportation. The research aims to measure the completeness of existing service facilities at the Leuwi Panjang terminal based on the Minister of Transportation Regulation No. 40 of 2015 concerning Service Standards for the Implementation of Public Transport Passenger Terminals. This research was conducted by conducting direct observation and taking documentation at the research location. After the data is collected then data analysis is carried out. From the results of data analysis, it was concluded how the service conditions at the Leuwi Panjang Terminal were. From the results of the study, it was found that the service facilities at the Leuwi Panjang terminal were quite dominant with a percentage of 61% of the total 41 service items that must be owned by a type A terminal, 39% of incomplete facilities at the Leuwi Panjang terminal were in the Safety and Convenience aspect. In connection with the results of the research, it is necessary to make adjustments in the form of rehabilitation and renovation at the Leuwi Panjang Terminal to improve service standards.
METODE PLAKSANAAN PEKERJAAN SLAB PADA JEMBATAN CILUTUNG DI KEC. TOMO KAB. SUMEDANG Maryono; Juliar, Eka
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.882

Abstract

Cilutung Bridge is one of the bridges located on Jalan Raya Tolengas, Tolengas, Tomo District, Sumedang Regency. Bridges have various types of bridges, namely girder bridges, arch bridges, truss bridges, suspension bridges. The bridge component is divided into two, namely the superstructure and the substructure. The structure of the bridge generally includes: sidewalks, vehicle floor slabs, girders, diaphragm beams, and platforms. The structure under the bridge generally includes: the base of the bridge (abutments), bridge pillars (piers) and foundations. The bridge slab is a horizontal structural element that functions to distribute dead and live loads to the vertical support frame of a structural system. The stages of implementing the bridge slab work are 1. Preparatory work, 2. Steel bridge deck installation, 3. Steel bridge deck grouting work, 4. Cantilever slab formwork assembly, 5. Slab and parapet reinforcement assembly, 6. Cantilever slab formwork installation, 7. Check completeness and measurement, 8. Bridge slab reinforcement installation, 9. Bridge parapet reinforcement installation, 10. Bridge slab formwork installation 11. Measurement, 12. Block out deck drain installation, 13. Bridge slab floor cleaning, 14. Inspection, 15. Bridge slab casting, 16. Slump and quality check, 17. Formwork demolition work, 18. Maintenance and tidiness.
PENGARUH RENDAMAN AIR LAUT TERHADAP KUAT TEKAN MORTAR FABA DENGAN PENAMBAHAN SIKAMENT LN Utomo, Tomy Dwi; Komarudin; Abdulgani, Hamdani; Aditya, Riski
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.883

Abstract

Selayaknya yang kita ketahui, air laut merupakan salah satu sumber daya alam terbesar yang dapat mempengaruhi mutu pada beton maupun mortar. Mortar merupakan material berwujud pasta yang terbuat dari pasir, air dan semen. Saat ini mortar dapat dimodifikasi dengan FABA (fly ash dan bottom ash). Namun hasil modifikasi mortar tersebut memungkinkan terjadinya perbedaan mutu pada mortar, sehingga perlu penambahan zat aditif berupa Sikament LN untuk mendongkrak mutu mortar. Dari penelitian yang bersifat eksperimental ini diketahui bahwa penambahan Sikament LN dengan dosis 0%, 0,5%, 1,5% dan 2,5% dari berat semen dengan perendaman air laut yang memiliki kadar garam 3,2% dapat mempengaruhi nilai kuat tekan mortar. Nilai kuat tekan rata-rata tertinggi untuk mortar FABA umur 28 hari yang direndam air tawar dengan dosis Sikament LN 2,5% yakni 20,45 MPa. Sedangkan pada mortar FABA umur 28 hari dengan penambahan Sikament 2,5% yang direndam dengan air laut, nilai kuat tekannya menurun menjadi sebesar 20 MPa.
Analisa Penjadwalan Proyek Rentang Headworks And Cipelang Main Canal Upgrading Works Rentang Irrigation Modernization Project (RIMP) Dengan Metode Diagram Pareto Kecamatan Jatitujuh Kabupaten Majalengka Hidayat, Agus; Nurjamilah, Lia Lailla; Taruan, Erni Sari Lombun
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.884

Abstract

Project scheduling has an important role in ensuring smooth project implementation and achieving the desired project objectives. In this context, the project scheduling analysis of the Rentang Headworks and Cipelang Main Canal Upgrading Works Rentang Irrigation Modernization Project (RIMP) in Jatitujuh District, Majalengka Regency is important to ensure the efficiency and effectiveness of project implementation. The Pareto diagram method is used in this analysis to identify and address key issues that may arise during project implementation. This research aims to improve the scheduling of the RIMP project by using the Pareto diagram method to increase the efficiency of time, cost, and resources. The results of the analysis show that the critical factors affecting the scheduling of the RIMP project are delays in material procurement, lack of coordination between related parties, and changes in demand from stakeholders. In the Pareto diagram, these problems are placed on the Y-axis and ranked in order of importance. After identifying the main problems, specific improvement measures were proposed to address each problem. Measures such as improving material procurement, enhancing coordination between relevant parties, and devising a more structured change request mechanism can help reduce delays and improve project scheduling efficiency. Using the Pareto diagram method, this RIMP project scheduling analysis provides a clear view of the key issues affecting project execution. The results of this analysis can be used by the project team to make better decisions in project planning and execution, with the hope of improving the efficiency and success of the project.
ANALISIS POMPA HYDRAULIC KILN TRHUSTER DAN PERAWATAN PADA ROTARY KILN PLANT 10 PT X Sonjaya, Cecep; Rachmat, Asep
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.888

Abstract

Abstract Hydraulics have been widely used, especially in the industrial world and have become a very important component because the hydraulic system can make machine work more economical. Many industrial processes use hydraulic systems to assist in the production process. One that uses a lot of hydraulic systems is the cement industry. PT Indocement Tunggal Prakarsa Tbk uses a hydraulic system in almost every component of its production. One of the production components that use it is the Rotary Kiln Kiln is a component that functions to burn cement raw materials and mix them by rotating continuously. Rotational movement that occurs can cause a shift in the kiln. To overcome this shift, there is one important component in the kiln circuit, namely the Hydraulic kiln thruster which functions to keep the kiln tube in place, besides helping to keep the kiln cylinder up and down. and maintenance of PT Indocement Tunggal Pakarsa Tok's Rotary Kiln Plan 10 as a report on practical work that has been carried out.
ANALISIS TENTANG KERUSAKAN DAN PERAWATAN ALAT BERAT DI DINAS PEKERJAAN UMUM DAN TATA RUANG (DINAS PUTR) Hermawan, Deden; Rachmat, Asep
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 7 (2023): STIMA 7.0 "Transformasi Peradaban Akademik Menyongsong Revolusi Industri 5.0"
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v7i0.894

Abstract

This abstract highlights the role and significance of the Public Works and Spatial Planning Agency (PUTR) in managing heavy equipment for various infrastructural and construction projects. The agency plays a crucial role in promoting sustainable development and infrastructure management in the region it serves. This abstract aims to provide an overview of the key aspects of PUTR's heavy equipment management practices and its impact on infrastructure development. The Public Works and Spatial Planning Agency (PUTR) is a government institution responsible for overseeing infrastructure development, spatial planning, and environmental management. As part of its core responsibilities, PUTR manages a diverse fleet of heavy equipment used for construction, maintenance, and rehabilitation of roads, bridges, buildings, and other public facilities. PUTR employs a comprehensive approach to heavy equipment management, focusing on strategic planning, acquisition, maintenance, and utilization. The agency collaborates with relevant stakeholders to ensure the efficient allocation and utilization of heavy equipment across different projects. By adopting modern technology and best practices, PUTR aims to enhance operational efficiency, reduce costs, and improve project timelines. The strategic acquisition of heavy equipment is a crucial aspect of PUTR's management approach. The agency conducts thorough assessments to identify the specific needs of different projects and procure equipment accordingly. Additionally, PUTR prioritizes eco-friendly and energy-efficient machinery to support sustainable development and minimize environmental impact. Maintenance plays a pivotal role in prolonging the lifespan of heavy equipment. PUTR implements proactive maintenance programs to ensure the optimal functioning of machinery and prevent unexpected breakdowns. Regular inspections, timely repairs, and adherence to safety standards are prioritized to ensure the safety of workers and the longevity of the equipment. PUTR's effective utilization of heavy equipment significantly influences the pace and quality of infrastructure development. Through streamlined equipment deployment and continuous monitoring, the agency maximizes productivity and minimizes downtime, leading to cost-effective and timely project completion. In conclusion, the Public Works and Spatial Planning Agency (PUTR) plays a critical role in managing heavy equipment for infrastructure development. Its strategic approach to acquisition, efficient maintenance practices, and optimal equipment utilization contribute to the successful implementation of various construction projects. As a result, PUTR's efforts significantly impact the region's overall growth and development while promoting sustainability and environmental responsibility in the realm of heavy equipment management.PUT