Alhanif Fairuszabadi
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Teknik Informatika STMIK Antar Bangsa

Analisa dan Pengujian Penguat Jaringan Seluler 3G Dengan Kabel Feeder Pada Gedung Cyber 2 Tower Alhanif Fairuszabadi; Dian Kasoni
Jurnal Teknik Informatika Vol. 5 No. 2 (2019): JTI Periode Agustus 2019
Publisher : LPPM STMIK ANTAR BANGSA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51998/jti.v5i2.364

Abstract

Abstract — Indoor Building Coverage (IBC) construction is one of the additional jobs for each operator to improve service quality due to signal attenuation from outside into the building. Cyber 2 Tower is one of the office buildings that will implement IBC development as a form of network service to customers. The performance of the IBC network that will be installed in the Cyber 2 Tower building will be analyzed and tested using hardware and software provided by PT. Bentala Sakti Globalindo as standardization in selling cellular signal booster services. In this study IBC network signal quality in the Cyber 2 Tower building was measured by conducting idle drive test mode using TEMS software already installed on sonyericsson K800i mobile phone which will be adjusted to the calculation previously made by the Cellular operator. From the measurement result obtained for GSM network with EIRP value 18,572 dBm yield RxLevel value equal to -39 dBm and EIRP of 14,062 dBm yield RxLevel value equal to -83 dBm. So the greater the value of Effective Isotropic Radiated Power (EIRP) generated antenna omni and antenna panel will be the better signal quality produced. Similarly, the smaller the value of EIRP generated antenna omni and antenna panel will be worse also the quality of the resulting signal.
Analisa dan Pengujian Penguat Jaringan Seluler 3G Dengan Kabel Feeder Pada Gedung Cyber 2 Tower Alhanif Fairuszabadi; Dian Kasoni
Jurnal Teknik Informatika Vol 5 No 2 (2019): JTI Periode Agustus 2019
Publisher : LPPM STMIK ANTAR BANGSA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51998/jti.v5i2.364

Abstract

Abstract — Indoor Building Coverage (IBC) construction is one of the additional jobs for each operator to improve service quality due to signal attenuation from outside into the building. Cyber 2 Tower is one of the office buildings that will implement IBC development as a form of network service to customers. The performance of the IBC network that will be installed in the Cyber 2 Tower building will be analyzed and tested using hardware and software provided by PT. Bentala Sakti Globalindo as standardization in selling cellular signal booster services. In this study IBC network signal quality in the Cyber 2 Tower building was measured by conducting idle drive test mode using TEMS software already installed on sonyericsson K800i mobile phone which will be adjusted to the calculation previously made by the Cellular operator. From the measurement result obtained for GSM network with EIRP value 18,572 dBm yield RxLevel value equal to -39 dBm and EIRP of 14,062 dBm yield RxLevel value equal to -83 dBm. So the greater the value of Effective Isotropic Radiated Power (EIRP) generated antenna omni and antenna panel will be the better signal quality produced. Similarly, the smaller the value of EIRP generated antenna omni and antenna panel will be worse also the quality of the resulting signal.