Claim Missing Document
Check
Articles

Found 6 Documents
Search
Journal : ComTech: Computer, Mathematics and Engineering Applications

Analisis Incremental Kelayakan Penambahan Lini Perakitan Engine Motor Pt Abc Jonny, Jonny
ComTech: Computer, Mathematics and Engineering Applications Vol 4, No 1 (2013): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v4i1.2800

Abstract

Manufacturing motorcycle unit in Plant 1 of PT ABC requires engine supply from Plant 2. This has some burden on the operating cost of Plant 1 and the opportunity loss as well due to delay of motor engine delivery. Based on the problem, team proposes additional engine line in Plant 1 to cut engine supply from Plant 2. Therefore, team analyzes this proposal using incremental analysis to determine whether the proposal is feasible or not by comparing before and after condition with result NPV about IDR 967 Billion and Payback Period under 1 year. By this result, team determines that this proposal is recommended to be approved by management. 
Analisis Kelayakan Investasi Perluasan Pabrik dengan Metode Cost-Volume-Profit dan Incremental pada PT XYZ, Jakarta Jonny, Jonny
ComTech: Computer, Mathematics and Engineering Applications Vol 3, No 1 (2012): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v3i1.2451

Abstract

PT XYZ received an offer of toll manufacturing services from its client as much as 360 units at a price of Rp14.000 for four years. To be able to fulfill the offer, the company must issue an investment of Rp1,3 billion for the plant expansion regarding to the limited capacity and specificity of the engine that must be purchased separately. There is also some additional operational cost for the company. Based on the analysis of costvolume-profit (CVP) the company realized that the price offered is far below the desired corporate profit by 27% so that the new price agreed upon in the negotiation is Rp16.000. Meanwhile, using the price agreement and macroeconomic assumption for the next four years, the company can finally concluded to accept the offer of its client with a value weighted NPV up to Rp306, 5 million based on the incremental analysis.
Upaya Penurunan Kejadian Kehilangan Gelas Berukuran Sedang Melalui Penerapan Metode Quality Control Circle (QCC) di Unit Gizi, RS ABC, Jakarta Jonny, Jonny
ComTech: Computer, Mathematics and Engineering Applications Vol 3, No 1 (2012): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v3i1.2452

Abstract

Nutrition Department of ABC Hospital provides food and beverage for all inpatients based on nutrition standard from their practioners. Therefore, Nutrition Department needs several types of cutlery for serving them food and beverage as needed. The stock of these types of cutlery should be maintained by nutrionists. During August and September 2011, the stock of middle-sized glasses had been deficit. This condition made the Nutrition Department initiate a QCC group named Sushi to prevent the deficit by strengthening the control over the stock. After this improvement, they had successfully suppressed the deficit from 193 to 77 units or 60.10%. Due to hospital regulation that every lost should be redeemed by nutritionist, this improvement had also enable the department to suppreesed the cost of lost units (quality cost).
Analisis Kelayakan Investasi Perluasan Pabrik dengan Metode Cost-Volume-Profit dan Incremental pada PT XYZ, Jakarta Jonny Jonny
ComTech: Computer, Mathematics and Engineering Applications Vol. 3 No. 1 (2012): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v3i1.2451

Abstract

PT XYZ received an offer of toll manufacturing services from its client as much as 360 units at a price of Rp14.000 for four years. To be able to fulfill the offer, the company must issue an investment of Rp1,3 billion for the plant expansion regarding to the limited capacity and specificity of the engine that must be purchased separately. There is also some additional operational cost for the company. Based on the analysis of costvolume-profit (CVP) the company realized that the price offered is far below the desired corporate profit by 27% so that the new price agreed upon in the negotiation is Rp16.000. Meanwhile, using the price agreement and macroeconomic assumption for the next four years, the company can finally concluded to accept the offer of its client with a value weighted NPV up to Rp306, 5 million based on the incremental analysis.
Upaya Penurunan Kejadian Kehilangan Gelas Berukuran Sedang Melalui Penerapan Metode Quality Control Circle (QCC) di Unit Gizi, RS ABC, Jakarta Jonny Jonny
ComTech: Computer, Mathematics and Engineering Applications Vol. 3 No. 1 (2012): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v3i1.2452

Abstract

Nutrition Department of ABC Hospital provides food and beverage for all inpatients based on nutrition standard from their practioners. Therefore, Nutrition Department needs several types of cutlery for serving them food and beverage as needed. The stock of these types of cutlery should be maintained by nutrionists. During August and September 2011, the stock of middle-sized glasses had been deficit. This condition made the Nutrition Department initiate a QCC group named Sushi to prevent the deficit by strengthening the control over the stock. After this improvement, they had successfully suppressed the deficit from 193 to 77 units or 60.10%. Due to hospital regulation that every lost should be redeemed by nutritionist, this improvement had also enable the department to suppreesed the cost of lost units (quality cost).
Analisis Incremental Kelayakan Penambahan Lini Perakitan Engine Motor Pt Abc Jonny Jonny
ComTech: Computer, Mathematics and Engineering Applications Vol. 4 No. 1 (2013): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v4i1.2800

Abstract

Manufacturing motorcycle unit in Plant 1 of PT ABC requires engine supply from Plant 2. This has some burden on the operating cost of Plant 1 and the opportunity loss as well due to delay of motor engine delivery. Based on the problem, team proposes additional engine line in Plant 1 to cut engine supply from Plant 2. Therefore, team analyzes this proposal using incremental analysis to determine whether the proposal is feasible or not by comparing before and after condition with result NPV about IDR 967 Billion and Payback Period under 1 year. By this result, team determines that this proposal is recommended to be approved by management.