Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Journal The Winners

Analisis Program Pengembangan Agrobisnis Holtikultura dengan Metode Policy Analysis Matrix Budiman Notoatmojo; Haryadi Sarjono
The Winners Vol. 7 No. 2 (2006): The Winners Vol. 7 No. 2 2006
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/tw.v7i2.615

Abstract

In general, article present an evaluation to find out how far does the development program of agribusiness based on horticultural plant production succeed. This evaluation program uses macro indicator including production development and the productivity of horticultural commodity, the development of national add value, and the contribution to the independency of the national logistic. While the micro indicator includes the profitability level of the horticultural agribusiness, competitive level, and theissues and problems that must be faced while the PPAH program is in progress. 
Analysis, Reconstruction and Establishment Tourist Destination in Toba Samosir, North Sumatera, Indonesia Menara Simanjuntak; Haryadi Sarjono
The Winners Vol. 13 No. 2 (2012): The Winners Vol. 13 No. 2 2012
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/tw.v13i2.658

Abstract

This study aimed to provide inputs for local government of Toba Samosir (Tobasa) in preparing strategic development plan of tourist destinations in District Tobasa. This study is a qualitative approach through in-depth interviews and feedback from forum discussion groups with participants representing community leaders, indigenous peoples, governments and travel business. Total participants are 15 people collected on June 1, 2012 at Balige government office. Discussion forums formulated nine locations of tourist destination spread in Toba Samosir. As result this research, we formulated four strategic plans with tactical plans; (1) specifying and establish the location of tourist destinations in the District Tobasa; (2) submitting plans to the government budget or through the budget of Tobasa district in five years starting in 2014 to follow; (3) conducting government financing for infrastructure development and tourism industry participation; (4) doing tourism and cultural promotion. We found limitations for the plan. Some of them were: the low budget provided by the District government so that we expected supports from domestic investors to accelerate tourism development in the area. Most activities were proposed under the action plan of both Tobasa District government and North Sumatra Government.
Penerapan Model Transportasi dan Decision Tree pada Distribusi Barang Arlita Armanto; Haryadi Sarjono
The Winners Vol. 13 No. 1 (2012): The Winners Vol. 13 No. 1 2012
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/tw.v13i1.665

Abstract

Goods distribution has a firm connection with transportation cost. Transportation method used by a company will cause great impact on company’s profit. If company’s profit can be maximal, the company will be able to develop its business even greater. Some problem solution steps proposed were: determining optimum criteria, developing alternative solution, developing optimum model, and  practicing chosen implicative planning solution. These steps were implemented to obtain optimum goods distribution cost to gain maximum profit.  This research resulted in that the distribution cost for goods implemented by current method in the company has been already optimum. Then for the following development, Decision Tree Method was used, where the results are: shipping to Yogyakarta using Sinar Aji transportation service with minimum EMV Rp.2.993.342; shipping to Salatiga using own car with EMV Rp.2.659.388; shipping to Purwokerto using Sinar Aji transportation service with EMV Rp.2.563.859; shipping to Cirebon using Sinar Aji transportaion service with EMV Rp.2.443.792; shipping to Semarang using Sinar Aji transportation service with EMV Rp.4.203.489. As the conclusion, goods shipping method which has been implemented by the company until now is optimum so it still can be used for any following business development as well as provides an iluustrative plan for the company.