Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Bandar: Journal of Civil Engineering

Analisis Penerapan Manajemen Waktu Pada Proyek Jalan Kabupaten Polewali Mandar Indra Wati; Nurmiati Z
BANDAR: JOURNAL OF CIVIL ENGINEERING Vol 1 No 1 (2018): BANDAR: JOURNAL OF CIVIL ENGINEERING
Publisher : Universitas Sulawesi Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31605/bjce.v1i1.156

Abstract

Studi ini secara khusus membahas bagaimana pelaksanaan manajemen waktu proyek konstruksi pada perusahaan konstraktor klasifikasi besar di Sulawesi Barat, yaitu PT. Mutiara Prima. Adapun penelitian dilakukan dengan wawancara dan studi literatur studi ini meliputi pengumpulan data, menentukan penjadwalan proyek, pemakaian sumber daya tenaga kerja, pemakaian sumber daya peralatan, kendala yang dihadapi oleh perusahaan kontraktor dan penangannya, monitoring serta waktu penyelesaian pekerjaan proyek konstruksi jalan disimpulkan bahwa pelaksanaan manajemen waktu yang dilakukan oleh perusahaan kontraktor di Sulawesi Barat belum sepenuhnya mampu melaksanakan secara ideal, karena masih belum sempurna dalam melaksanakan setiap aspek dari manajemen waktu. Monitoring merupakan salah satu aspek tersulit untuk dilakukan secara akurat dan teliti dikarenakan harus adanya korelasi yang kuat antara level excutive management dengan para pelaksana di lapangan. Hal ini sangat penting untuk dilaksanakan sebab tidak digunakan sistem manajemen waktu khususnya bagi pelaksana dilapangan adalah terdapat miss comunication, ketidakmengertian secara benar pelaksanaan jadwal proyek dalam sistem manajemen waktu itu sendiri.
EFEKTIVITAS PELAYANAN ANGKUTAN UMUM PEDESAAN TRAYEK PAMBOANG – PASAR SENTRAL MAJENE Mahmud bibi; Muhammad Harun; Nurmiati Z
BANDAR: JOURNAL OF CIVIL ENGINEERING Vol 1 No 2 (2019): Bandar: Journal of Civil Engineering
Publisher : Universitas Sulawesi Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31605/bjce.v1i2.189

Abstract

ABSTRAK;Beberapa ruas jalan pada Trayek Terminal Majene PP dan Trayek Pamboang PP, pada jam-jam puncak angkutan umum yang ada cenderung digunakan melebihi kapasitas maksimumnya. Keadaan sebaliknya terjadi pada jam non-puncak, kendaraan umum setengah kosong dan harus melakukan kompetisi dengan angkutan umum lainnya untuk mendapatkan penumpang. Tujuan dari penelitian adalah mengetahui kinerja pelayanan angkutan umum, kebutuhan angkutan umum dan membuat rekomendasi terkait dengan hasil evaluasi kinerja pelayanan pada kedua trayek ini. Dalam penelitian ini indikator kinerja angkutan umum yang dinilai adalah faktor muat, waktu perjalanan, frekuensi pelayanan, waktu antara, waktu tunggu, jumlah kendaraan yang beroperasi, dan waktu pelayanan. Indikator diperoleh dari hasil survey. Hasil anlisis pelayanan angkutan umum menurut Dirjen Perhubungan Darat, kinerja pelayanan angkutan umum pada trayek Trayek Terminal Majene PP dan Trayek Pamboang PP termasuk dalam kategori baik. Kebutuhan jumlah angkutan umum pada trayek Terminal Majene PP dan trayek Pamboang PP Trayek Terminal Majene PP sebanyak 35 unit. Berdasarkan hasil analisis direkomendasi: jumlah angkutan umum yang sudah ada dipertahankan saja atau dikurangi hingga mendekati nilai rata-rata jumlah kendaraan beroperasi setiap hari serta perlunya pembinaan pada pengemudi tentang kesadaran berlalu lintas yang baik di jalan raya. Kata kunci: Analisis, kinerja, angkutan umum, pelayanan ABSTRACT;Sometimes in Oebobo Station-Majene Station route and Pamboang Station- Station route, over capacity for public transportation happened in the peak time especially in several roads. While, in peak off time, most of public transportation have no passanger, so they had to compotate with the other transportation the get the passanger. Service operational planning of public transportation should be evaluate as soon as possible to know how about the performance of public transportation services. The goal of this research are to know about public transportation services performance, fleet necessity of public transportation and make recommendations relating to the results of the performance evaluation of services on this route both. The indicators of this research are public transportation performance, load factor, time journey, frequency, time line, passenger time waiting, the quantity of vehicle operated, and time services. All of these indicators get from dinamyc and statistic survey. From the results of the public transport service standards evaluation by the Directorate General of Land Transportation, the performance of public transport services on the Majene Station Route and Pamboang Route including good categories. The needs of public transport fleet on the Majene Station-Pamboang Route is 35 units, whereas for Majene Station-Pamboang Station Route 35units. Based on the results of the evaluation given recommendations are: for while the number of existing public transport or retained only if necessary, be reduced to close to the average value of the number vehicles in operation each day as well as the need for guidance drivers about traffic awareness good on the highway.
ANALISIS PRODUKSI ALAT BERAT TERHADAP PEKERJAAN GALIAN PADA PROYEK JALAN (SUMBERJO-PELITAKAN) Okky Anwar; Milawaty Waris; Nurmiati Zamad
BANDAR: JOURNAL OF CIVIL ENGINEERING Vol 2 No 1 (2019): Bandar: Journal of Civil Engineering
Publisher : Universitas Sulawesi Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31605/bjce.v2i1.637

Abstract

Produksi alat berat adalah kemampuan atau hasil maksimal yang dicapai oleh suatu alat berproduksi dalam satuan jam atau hari, dimana kapasitas produksi yang besar akan mempercepat dan memperlancar penyelesaian proyek, namun sebaliknya apabila produktifitas alat kecil maka pekerjaan akan lambat dan tidak sesuai dengan rencana penyelesaian proyek. Pekerjaan galian tanah (quarry) adalah kegiatan menggali untuk memperoleh bahan material tanah dari sebuah lokasi, material diperoleh dengan cara menggali dengan alat excavator dengan kedalaman dan batas batas yang sudah di sepakati dan ditentukan kemudian volume material diangkut oleh dumptruck dan harus sesuai dengan kapasitas bak dari dumptruck. Produksi alat berat dalam penelitian menggunakan metode kuantitatif dan kualitatif. Hasil analisa perhitungan produksi alat berat excavator diperoleh 17,58 m³/per-jam, dengan produksi per-siklus sebesar 0,72 m³, dan waktu siklus digunakan satu putaran selama 54 detik. Sedangkan volume galian tanah yang terbesar pada pekerjaan galian sebesar 79,1 m³, volume galian tanah terkecil sebesar 53,7 m³. Alat berat dump truck diperoleh siklus 9,74 menit dengan persiklus sebanyak 2,56 m³ dengan produksi perjam sebanyak 6,46 m³. Biaya yang dikeluarkan untuk penggunaan alat berat jenis excavator dan dump truck masing-masing untuk excavator sebesar Rp. 8.005.270,- dan dump truck Rp. 8.322.554,-