Ade Irman S M
Jurusan Teknik Industri, Universitas Sultan Ageng Tirtayasa

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Penjadwalan Flexible Job Shop: Studi Kasus PT. X Bobby Kurniawan; Ade Irman S M
Performa: Media Ilmiah Teknik Industri Vol 14, No 1 (2015): PERFORMA Vol. 14 No 1, Maret 2015
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (305.151 KB) | DOI: 10.20961/performa.14.1.11016

Abstract

Flexible Manufacturing System (FMS) is characterized by process and routing flexibility which gives several machines in the facility has more than one process capabilities. However, high investment is needed to implement FMS. As a consequence, equipment on FMS must be operated in full utilization to overcome the fixed cost incurred. Furthermore, customers want their product delivered on time. Hence, good planning and scheduling play important role to achieve these goals. The resource allocation problem in FMS to fulfill customers’ satisfaction can be modeled by Flexible Job Shop Problem (FJSP) using lateness criteria. Mixed integer programming is used to solve the Flexible Job Shop problem.