Penerapan Alat Bantu Lifter Bridge Untuk Mengurangi Waktu dan Jarak Tempuh Dalam Pemindahan Barang Setengah Jadi di PT. TMMIN Yulvani Anggi Rahmawati
Jurnal Teknika Vol 13, No 2 (2021): Jurnal Teknika
Publisher : Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/jt.v13i2.659

Abstract

PT TMMIN's logistics department is responsible for the smooth supply of component parts to the production line. In the delivery of parts, there is a problem, namely traffic disturbances in the PAD supply with the supply ip module. Both supplies cannot be in the same area due to insufficient area space. This situation causes the operator's workload to be a waste of steps and time. To overcome this problem, it is proposed to replace the part delivery tool that is currently used with a push dolly with a karakuri lifter bridge. Tool changes are carried out with 3M+1E aspects, namely method, material, man and environment. Change of equipment can affect factors such as no traffic disruptions with other supplies, reduction of SPS area, reduction of SPS distance to pp module and increasing company productivity efficiency.
Penerapan Alat Bantu Lifter Bridge Untuk Mengurangi Waktu dan Jarak Tempuh Dalam Pemindahan Barang Setengah Jadi di PT. TMMIN Yulvani Anggi Rahmawati
Jurnal Teknika Vol 13 No 2 (2021): Jurnal Teknika
Publisher : Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/jt.v13i2.659

Abstract

PT TMMIN's logistics department is responsible for the smooth supply of component parts to the production line. In the delivery of parts, there is a problem, namely traffic disturbances in the PAD supply with the supply ip module. Both supplies cannot be in the same area due to insufficient area space. This situation causes the operator's workload to be a waste of steps and time. To overcome this problem, it is proposed to replace the part delivery tool that is currently used with a push dolly with a karakuri lifter bridge. Tool changes are carried out with 3M+1E aspects, namely method, material, man and environment. Change of equipment can affect factors such as no traffic disruptions with other supplies, reduction of SPS area, reduction of SPS distance to pp module and increasing company productivity efficiency.