p-Index From 2020 - 2025
0.408
P-Index
This Author published in this journals
All Journal Jurnal Titra
I Gede Agus Widayana
Industrial Engineering Department, Petra Christian University

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Titra

Perancangan Perbaikan Pembagian Beban Kerja Work Center Satori Cell Line CV. Sinar Baja Electric Wiryamanta Suciadi; I Gede Agus Widayana
Jurnal Titra Vol 10, No 2 (2022): Jurnal Titra 10(2) Juli 2022
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Division of workload is important for manufacturing companies in the ongoing production process. CV. Sinar Baja Electric, which one of the largest loudspeakers manufacturers in Indonesia doesn’t yet have standard workload share in some part of the production division. One of the divisions is the Work Center Satori Cell Line, which is a loudspeaker assembly production line with the Satori trademark.  So far, the company has had difficulty in distributing a balanced workload for operators because they still do not have standard time data for each of the existing sub-operations. The division of labor is assisted by the line balancing method to get a balanced division of labor. The results of this study are the standard for all sub-operations and the distribution of operator workload at the Work Center Satori Cell Line per product type. Through the proposed improvements can increase the daily output produced. The increase occurred in assy 1 by 7.14% and 53.57% in assy 2 Satori type TX. Meanwhile, in assy 1, the MW/MR and 6.5MR types increased by 3.13% and 17.86%, respectively.
Perancangan Alat Prediksi Cycle Time menggunakan Macro Excel dengan Metode Regresi Linear pada Produksi 1 Line 4 CV. Sinar Baja Electric Jefferson Adrian Halim; I Gede Agus Widayana
Jurnal Titra Vol 10, No 2 (2022): Jurnal Titra 10(2) Juli 2022
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In a manufacturing company, cycle time is the most crucial thing for a company. As a manufacturing company CV. Sinar Baja Electric does not have an accurate cycle time in every product, so there are some products that still do not have the suitable cycle time, which makes the productions become less effective and efficient. Therefore, an improvement is needed on the inaccurate cycle time. The improvement is intended for the company so that they can have a cycle time in every product that helps in every production process. Statistical test, statistical description analysis, standard time, hypothesis test and linear regression methods are used in this research. Later, data processing will be used for designing a cycle time prediction tool, using the macro excel with the visual basic application tool. Therefore the cycle time prediction tool can be used for predicting the cycle time in a product based on the processes.