REKAYASA NILAI PEMBUATAN TERHADAP WAKTU DAN SPESIFIKASI PEKERJA PADA PEMBANGUNAN PERUMAHAN PESONA TUGU RANTE RESIDENCE TYPE 45 KABUPATEN BLITAR

Sugianto, Sugianto (Unknown)



Article Info

Publish Date
15 Mar 2017

Abstract

due torecent economic situation, contractors have een required to be able to minimize cost and the same time to also maintain the quality of the project. One of the methods that can be apllied as an alternative to achieve it is value engineering. The aim of this studyis to apply this method in a construction project. The construction project ofHousing development in charm tugu rante type 45 residence district blitar Rp 99,792,000.00Value engineering method consist of 4 ( five ) phases. It covers information phase, which contains of identification of the high-cost work and the unnecessary cost ( function analysis ); creative phase; analyzing phase which includes the selection of alternative dealing with the analysis of its benefit and cost, it project life cycle cost and the selection of alternatives by using AHP method; and Recommendation phase.By implementing thismethod,the project cost can be minimized in 5 area of wark,woll work Rp1,902,459,wall strucco work Rp3,941,693,the work of the faundotion stone,soil excavation Rp211,616,excavation work Rp782,012,ceramic work Rp294,775. Thus total reduction cost that be achieved by using this method is upto

Copyrights © 2017






Journal Info

Abbrev

qua

Publisher

Subject

Engineering

Description

Focus dan Scope: Hasil penelitian teknik dan aplikasinya tentang: 1. Teknik Elektro 2. Teknik Sipil 3. Kajian dan aplikasi teori 4. Pendidikan dan pembelajaran di bidang ...