Antisipasi Keterlambatan Proyek Pembangunan Shelter dengan Menggunakan Metode What-If Analysis

Ineu Widaningsih (President University)
Anastasia Lidya Maukar (President University)
Avania Shinta (President University)



Article Info

Publish Date
08 Nov 2018

Abstract

The purpose of this study is to identify the delay in building shelter projects and activities that cause delays. This research will provide suggestions on steps to be taken to overcome delays. This research uses two methods of control, namely the "what-if analysis" method for solutions if there is a delay in the project, as well as a method of shortening the duration of critical paths Duration Crashing on critical infrastructure with the addition of workers or the application of overtime work as an alternative control were performed. Currently, the critical path has not been identified and there is no solution provided to overcome the problem of delays in shelter construction projects. The target duration of the construction of the shelter construction project is known for 14 days but it has been delayed into 35 days. The results of this study are findings of some critical activities that can cause delays and what-if analysis is done for time acceleration of 10% to 100%.Keywords: What If analysis, Critical Path Method, shelter, Duration Crashing.

Copyrights © 2018






Journal Info

Abbrev

journalofIndustrialEngineerin

Publisher

Subject

Industrial & Manufacturing Engineering

Description

JIE: Journal of Industrial Engineering (Online ISSN: 2527-4139; Printed ISSN 2503-3670) is a scientific journal in the field of industrial engineering that publishes scientific writings on pure and applied research in industrial system, including (but not limited to): Production system, Inventory ...