Matrik : Jurnal Manajemen dan Teknik Industri Produksi
Vol 15 No 1 (2014)

Penentuan Interval Penggantian Komponen Pada Motor Listrik Untuk Meminimalkan Resiko Downtime di PT. Wilmar Nabati Indonesia

Guritno Catur Pamungkas (Unknown)



Article Info

Publish Date
17 Sep 2018

Abstract

The Failure of production machines in PT. Wilmar Nabati Indonesia can make serious problem, because it can stop process production and increase breakdown time while waiting machines repaired by technician. Company doesn’t want this problem, because it can effect on planning and controlling production and decrease the achievement of production target. So target of production can’t be full filled.Based on the analitic and intrepetation on this paper, we can take a conclusion from this research, the conclusion are the higest failure frequency in component of electrical motoric machine is in a bearings component. Optimalized interval time is 17 days and downtime value is 0,01946, based on calculation of age replacement model with minimation of downtime crirteria. In that interval, we can know that failure probability of component is 0,02888 and reliability of component is 0,7054 ≈ 0,7: based on the calculation also we can know that failure rate is 0,040016

Copyrights © 2018






Journal Info

Abbrev

matriks

Publisher

Subject

Engineering Industrial & Manufacturing Engineering

Description

Matrik Journal is published by Industrial Engineering Department, Faculty of Engineering University of Muhammadiyah Gresik, twice a year in March and September. The purpose of this journal is to facilitate scientists, researchers and practitioners to publish original research articles or article ...