Prokons: Jurnal Teknik Sipil
Vol. 8 No. 2 August 2014

ANALISA PERBANDINGAN BIAYA DAN WAKTU PERKERASAN KAKU METODE CAST IN SITU (CIS) DAN METODE PRECAST PRESTRESSED CONCRETE PAVEMENT (PPCP) (Studi Kasus Pada Proyek Jalan Tol X Di Jawa Timur)

Rakmat Dwi Anugrah Putra, Sugiharti (Unknown)



Article Info

Publish Date
31 Aug 2014

Abstract

Concrete cracks on pavement occurred at X Toll Road implementation before the pavement attained the expected time. Consquently, it must be removed and it caused cost and time loss. CIS is a method in which fresh concrete is cured in site, and PPCP is the one in which the pavement is stressed by stretching the steel tendon and anchor into the fresh concrete before live load is applied.  The objective of the study is to compare method between the two from cost and time. California Bearing Ratio (CBR), technical drawing, daily passing vehicle rate, concrete, and itemized work cost were employed. National Association of Australian State Road Authorities (NAASRA) was employed to implement the rigid pavement; American Concrete Institute (ACI) was based on PPCP for the pavement depth design.The calculations result in 27 cm deep of CIS and 20 cm deep of PPCP; IDR 216.336.692.351,25   and 208 workday for CIS ; IDR 222.068.995.407,73 and 158 workdays for PPCPKeywords: cast in situ, cost and time, rigid pavement, prestressed precast concrete pavement

Copyrights © 2014






Journal Info

Abbrev

PROKONS

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Materials Science & Nanotechnology

Description

Jurnal Teknik Sipil (PROKONS), Terbit dua kali dalam setahun. PROKONS menerbitkan artikel penelitian yaitu penelitian asli teoretis dan eksperimental yang mengeksplorasi atau mengeksploitasi ide-ide dan teknik baru di empat bidang utama: teknik struktural, geomekanik, manajemen proyek konstruksi dan ...