Prokons: Jurnal Teknik Sipil
Vol. 12 No. 2 August 2018

PROJECT PLANNING PEMBANGUNAN PROYEK JALAN PENGHUBUNG PENYINGGAHAN–MUARA PAHU KUTAI BARAT PROVINSI KALIMANTAN TIMUR

Yanuar Komarudi, Moch. Khamim, Joko Setiono (Unknown)



Article Info

Publish Date
18 Jul 2019

Abstract

7.8-km Penyinggahan - Muara Pahu Connecting Road Kutai Barat experienced delays. The purpose of this thesis is to anticipate the delays by making an alternative project planning consisting of a site layout, a cost estimate, an implementation method, a schedule, quality management, and safety, health and environment  (SHE) planning.The required data were of the existing site layout of the project, shop drawings, cost and estimate, work and material unit price of Kutai Barat 2016. MS Project 2007 was applied for scheduling, Autocad 2007 for drawing the site layout, MS Excel for estimating.The planning results in (1) an efficient site layout including a direction kit 3.5km from project location; (2) an implementation method by forwarding critical works like mobilization;(3) 240 calendar days; (4) at Rp._48,257,108,000.00 (5) a quality management system by inspection and testing each stage of work; (6) planning SHE referring to the aspects of SHE and identifying the risks referring to Risk Assessment Matrix (RAM) for each work . Keywords: site layout, implementation method, cost estimate, scheduling, quality  management,  SHE

Copyrights © 2019






Journal Info

Abbrev

PROKONS

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Materials Science & Nanotechnology

Description

Jurnal Teknik Sipil (PROKONS), Terbit dua kali dalam setahun. PROKONS menerbitkan artikel penelitian yaitu penelitian asli teoretis dan eksperimental yang mengeksplorasi atau mengeksploitasi ide-ide dan teknik baru di empat bidang utama: teknik struktural, geomekanik, manajemen proyek konstruksi dan ...