Prokons: Jurnal Teknik Sipil
Vol. 8 No. 1 February 2014

KAJIAN PENGGUNAAN BETON PRACETAK PADA PROYEK PEMBANGUNAN RUSUNAWA (Studi Kasus Pembangunan Rusunawa POLDA JATIM-Surabaya)

Sugiharti , (Unknown)



Article Info

Publish Date
28 Feb 2014

Abstract

The use of precast concrete is planned on work structure tie beam, columns, beams, and slab for precast systems have the advantage in terms time and cost efficiency compared to conventional systems (cast in place) to reach the targets that have been planned by the government.The purpose is to find out the cost efficiency and time usage precast. The cost analysis was obtained from the multiplication of bill of quantity and the work volume. To find a network using the Precedence Diagram Method (PDM) which was processed through Microsoft Project 2007 software then arranged in Bar Chart. The Bar Chart was arranged in the S-Curve with Microsoft Excel 2007 software. From the calculations, total project cost is IDR 13,300,074,303.07 with the cost efficiency IDR 604,137,428.00 or 4.34% less than the conventional method and the duration is 214 days with the time efficiensy 86 workdays or 28.67% quicker than the conventional method.Keywords: pre-cast concrete, cost, time, efficiency

Copyrights © 2014






Journal Info

Abbrev

PROKONS

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Materials Science & Nanotechnology

Description

Jurnal Teknik Sipil (PROKONS), Terbit dua kali dalam setahun. PROKONS menerbitkan artikel penelitian yaitu penelitian asli teoretis dan eksperimental yang mengeksplorasi atau mengeksploitasi ide-ide dan teknik baru di empat bidang utama: teknik struktural, geomekanik, manajemen proyek konstruksi dan ...