Jurnal Rekayasa Sistem Industri
Vol. 8 No. 1 (2019): Jurnal Rekayasa Sistem Industri

Perancangan Perbaikan Pelayanan Bongkar Muat Dermaga X Dengan Menggunakan Extend Simulasi

Misra Hartati (Fakultas Sains dan Teknologi, Jurusan Teknik Industri, UIN Suska Riau Jl. HR. Soebrantas No. 155, Pekanbaru 28293)
Ahmad Kurniawan (Fakultas Sains dan Teknologi, Jurusan Teknik Industri, UIN Suska Riau Jl. HR. Soebrantas No. 155, Pekanbaru 28293)
Melfa Yola (Fakultas Sains dan Teknologi, Jurusan Teknik Industri, UIN Suska Riau Jl. HR. Soebrantas No. 155, Pekanbaru 28293)
Merry Siska (Fakultas Sains dan Teknologi, Jurusan Teknik Industri, UIN Suska Riau Jl. HR. Soebrantas No. 155, Pekanbaru 28293)



Article Info

Publish Date
30 Apr 2019

Abstract

Large-scale logistics companies deliver products using sea transportation effectively. Company X as one of the pioneer port containers service still has limitations both from minimal stacking capacity and limited equipment, 1 HMC unit and 1 unit reach adapter. The number of containers increases from 2014-2017, but the availability of tools and facilities that needed continue to cause overcapacity problem. This paper aims to determine the yard occupancy ratio (YOR), berth occupancy ratio (BOR) and utility equipment that are in accordance with the standards to prevent overcapacity at port X until 2020. This study uses extend simulation method to make improvements and analysis of conditions that running, the results of the study are recommendations for the addition of 2 units of transport and the addition of reach units of 2 units. For the YOR value, additional capacity from 2,046 TEUs was made to 3,800 TEUs so that the initial maximum YOR was 139.8% to 75.3%, while BOR still in maximum BOR capacity which is 24.0%.Keywords: Container, Discrete Event Simulation, ExtendSim, Port

Copyrights © 2019






Journal Info

Abbrev

jrsi

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Data and Analytics Decision Analysis E-Business and E-Commerce Engineering Economy and Cost Analysis Human Factors Information Systems Intelligent Systems Manufacturing Systems Operations Research Production Planning and Control Project Management Quality Control and Management Reliability and ...