Jurnal Titra
Vol 4, No 1 (2016): Jurnal Titra

Upaya Mengurangi Keterlambatan Proses Produksi PT. Aweco Indosteel Perkasa

Rikky Yanuar (Unknown)
Jani Rahardjo (Unknown)



Article Info

Publish Date
18 Jan 2016

Abstract

Scheduling is an important thing to determine accuracy on a project delivery to customers. Delays on a project delivery of PT. Aweco Indosteel Perkasa because of in­a­ccurate esti­mated calculation processing time which makes the difference from planned sche­dule with the plan conditions on production. To analyze the causes of delay, used the QCC (Quality Control Ci­rcle) method to get root cause is inaccuracy of estimated cal­c­ulation time jobs and uncontrolled material arrival process. Initial estimated schedule plan for polishing takes 8 shift, while based on the calculation time takes 11.24 shift and on­ the plan conditions takes 17 shift. This indi­cated that there were differences bet­ween plan time, the initial estimate, and the estimate time of calculation. Machine set up makes a difference estimated calculation, whereas the machine set up time very con­sidered in the estimated time calculation of polishing work. Efforts to catego­ri­zing tank types based on components of the tanks was also made. Beside that, calculating time esti­mation in polish machine done for categorizing type of tank.

Copyrights © 2016