Jurnal Proyek Teknik Sipil
Vol 2, No 2 (2019): September

STUDI PERBANDINGAN ALTERNATIF PENINGGIAN ELEVASI JALAN DENGAN PENGGUNAAN BANGUNAN PROTEKSI PIPA TERHADAP BIAYA, MUTU DAN WAKTU

fauziyah, shifa (Unknown)
Nurjihad C, Fajar (Unknown)
Suwarto, Fardzanela (Unknown)



Article Info

Publish Date
27 Nov 2019

Abstract

One of the work items in the Soekarno-Hatta Airport Accessibility and Ducting Utility Project is widening the M1-M2 road. Pit test results in that area indicate that there is a 40 cm (16 ") diameter Pertamina pipeline at a depth of 0.7 m. The pipe is used to flow aircraft fuel so it is not possible to be relocated, this condition is called road crossing pipeline. Alternative solutions to overcome these problems are road elevation and the making of pipe protection from concrete. Road elevation costs as much as Rp 13,626,916,287.02 compared to alternative construction of pipeline protection amounting to Rp 23,200,588,370. The time for completing the elevation of the road is faster, which is around 47 weeks, while the implementation of the road and making pipeline protection takes 61 weeks. In terms of quality, in soil compaction during the road elevation process uses a vibroroller so that compaction is evenly distributed. Based on the comparative results in terms of cost, time and quality, the alternative solution to the problem road crossing pipeline is road elevation.

Copyrights © 2019






Journal Info

Abbrev

potensi

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal Proyek Teknik Sipil is an open access journal (e-journal) that focusing in scientific work in the field of Appllied Civil Engineering that can be product of researches, literature review, or case study including Construction and Building Material, Construction Management, Geotechnical ...