ComTech: Computer, Mathematics and Engineering Applications
Vol 4, No 1 (2013): ComTech

Model Terintegrasi Penjadwalan Batch dan Pm dengan Kriteria Minimalisasi Biaya Simpan, Setup dan Pm pada Mesin dengan Increasing Failure Rate

Zahedi, Zahedi (Unknown)



Article Info

Publish Date
30 Jun 2013

Abstract

Development of today's manufacturing systems leads to the getting shorter in product life cycle, more variety of products, as well as increasing in consumer demand for quality and timeliness. Thus the accuracy and speed of decision-making within the manufacturing system becomes important. This paper proposes an integrated model of batch scheduling and preventive maintenance scheduling, in assumption no non-conforming parts to the criteria of minimizing the total saving cost, setup cost, preventive maintenance cost in minimizing the actual flow time on a machine with increasing failure rate. An example is provided to show how the model and algorithm work.

Copyrights © 2013






Journal Info

Abbrev

comtech

Publisher

Subject

Computer Science & IT Engineering Mathematics

Description

The journal invites professionals in the world of education, research, and entrepreneurship to participate in disseminating ideas, concepts, new theories, or science development in the field of Information Systems, Architecture, Civil Engineering, Computer Engineering, Industrial Engineering, Food ...