Jurnal Teknik Industri
Vol 16, No 2 (2015): Agustus

Penentuan Interval Waktu Penggantian Komponen Kritis Pada Mesin Volpack Menggunakan Metode Age Replacement

Prawiro, Yanuar Yuda (Unknown)



Article Info

Publish Date
09 May 2017

Abstract

CV. Cool Clean is a company engaged in packing tissue. During this time the company only perform corrective action that causes disruption of the production process due to frequent damage of a sudden the engine components volpack. In this study used a model of preventive replacement that can reduce downtime and costs. The method used to obtain the schedule interval a critical component is age replacement method. Seal heater obtained replacement time interval of 30 days with a 22% reduction in downtime. Replacement interval for knife foil is 26 days with a 27% reduction in downtime. Replacement interval for solenoid valve is30 days with a 29% reduction in downtime. Replacement interval forOring seal is 18 days with a 29% reduction in downtime. Replacement interval for needle bearing is 62 days with a 25% reduction in downtime. Results of this study also showed that by applying age replacement can save costs for seal heater Rp. 974.000 or 23%. Knife foil cost savings of Rp. 1.251.409 or 22%. Solenoid valve cost savings of Rp.546.539 or 24%. Oring seal cost savings of Rp. 350.096 or 26%. And needle bearing cost savings of Rp. 196.712 or 26%.

Copyrights © 2015






Journal Info

Abbrev

industri

Publisher

Subject

Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Industrial & Manufacturing Engineering

Description

Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality ...