Jurnal Teknik Industri
Vol 3, No 2 (2002)

Perbandingan Performasi Metode Johnson dengan Heuristik Multi Tujuan Ditinjau dari Makespan Total Flow Time dan Iddle Time

Garside, Annisa Kesy (Unknown)



Article Info

Publish Date
26 Apr 2010

Abstract

This researchtd es to implementa methodo f rnachines chedulingfo r flow shopc alledMulti ObjectiveH euristicT. o makee asiera pplicationin attainingjo b sequencteh atm achinem ustdo alongw ith makespavna lue,l otal flow time, andi dle time,t hen a softwareis made Next, wemakea iomparisono f machines chedulingre sultp erformancbee tweenM ulti objectiveH euristicMethoda ndl ohnsonM ethodi f viewedf iom makespavna lue,t otalf low time,a ndi dlet ime. Fromthe resulto f researchc oncludedth at heuristic with multi objectivesm ethods howst he solutionsflow timet otalf ewert hanJ ohnsonm ethod

Copyrights © 2002






Journal Info

Abbrev

industri

Publisher

Subject

Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Industrial & Manufacturing Engineering

Description

Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality ...