Jurnal Spektran
Vol 6 No 1 (2018): Vol. 6, No. 1, Januari 2018

PENGEMBANGAN ANGKUTAN PEMADU MODADI BANDARA NGURAH RAI

Eka Tamar Agustini (Unknown)
Putu Alit Suthanaya (Unknown)
Dewa Made Priyantha Wedagama (Unknown)



Article Info

Publish Date
01 Feb 2018

Abstract

NgurahRai Airport is the third busiest international airport in Indonesia, after Soekarno-Hatta and Juanda International Airport. NgurahRai Airport services need to be improved, one of them with the development of integrated mode transport route at NgurahRai Airport. The purposes of this research are to analyze the potential demand and characteristic operational systemof integrated mode transport.Based on the results of analyses, it was found that potential demand of integrated mode transport is 15.385 people in 2016 and it is estimated to be 16.154 people in 2017. The number represents the amount of demand of the integrated transport mode for the eight routes of service. The service time is designed for 16 hours / day, divided into two shifts. The first shift operates from 05.00 A.M untill 13:00 PM, followed by the second shift that begin at 13.00 PM to 21:00 PM. The fare is IDR. 10.000 for all routes except Route 8 is IDR 4.500. Keywords: integrated mode transport, potential demand, operational system.

Copyrights © 2018






Journal Info

Abbrev

jsn

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal Spektran merupakan berkala ilmah online yang dikelola oleh Program Magister Teknik Sipil, Program Pascasarjana Universitas Udayana. Terbit pertama kali pada bulan Januari 2013 dan selanjutnya diterbitkan 2 kali setahun setiap bulan Januari dan Juli. Jurnal Spektran mempublikasikan hasil ...