Journals Mining Engineering : Bina Tambang
Vol 5, No 2 (2020): Journals Mining Engineering: Bina Tambang

Analisis Penentuan Waktu Standar Operasi Pemboran dan Produktivitas Jumbo Drill pada Pembuatan Lubang Ledak Menggunakan Metode Analisa Elemen Kerja dan Waktu Baku di Tambang Emas Bawah Tanah PT. Cibaliung Sumberdaya, Kabupaten Pandagelang, Provinsi Banten

Jevindo Ornandi Gemvita (Universitas Negeri Padang)
Mulya Gusman (Universitas Negeri Padang)



Article Info

Publish Date
06 Feb 2020

Abstract

Abstract. PT Cibaliung Sumberdaya is a gold mining company that implements an underground mining system. PT Cibaliung Sumberdaya is a subsidiary of PT. Aneka Tambang (Antam) located in Cimanggu District, Pandegelang Regency, Banten Province. In the production activities, the drill tool used for the activity is the Atlas Copco Boomer 282 with R32 drilling bit diameter 43 mm for drilling holes for split sets in supporting mesh and 51 mm diameter for explosive hole drilling using rotary-percussive drilling methods and burn cut drilling patterns . In August 2019 PT. CSD 14,397.6 wmt / month and actually reached 12,893.4 wmt / month. Based on the calculation, the actual productivity of the calculation results obtained 18.29 wmt / hour or 164.56 wmt / day which after the reduction of the tool productivity increased from 164.56 wmt / hour to 246.85 wmt / day. The Standard Time obtained from the calculation results is in the Drill Face Drilling of Class IV Rocks = 6.21 Minutes and Class III Rocks = 6.66 Minutes. On the Hole Drilling for Split Set and Wiremesh Installation the Class IV Rocks in Hole Drilling for Split Set = 5.87 Minutes and Wiremesh Installation = 7.39 Minutes, while those for Class III Rock in Hole Drilling for Split Set = 5.65 Minutes and Wiremesh Installation = 5.35 MinutesKeywords: Jumbo Drill, Productivity, Drill Face, Supporting, The Standard Time

Copyrights © 2020






Journal Info

Abbrev

mining

Publisher

Subject

Earth & Planetary Sciences

Description

Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini ...