MEDIA KOMUNIKASI TEKNIK SIPIL
Tahun 16, Nomor 1, PEBRUARI 2008

Analysis and Evaluation Change Order in Flexible Pavement (Case Study: Road Projects in East Kalimantan)

Sulistio, Hendrik (Unknown)
Waty, Mega (Unknown)



Article Info

Publish Date
09 Feb 2012

Abstract

Change Orders often occur in construction project, whether during early, middle, or late stage of  project. The objectives of this research are to find types of work and construction stages where change orders often occur; average percentage of change order costs anda main causes of change order in flexible pavement project in East Kalimantan. Data for the research were obtained by first, distributing questionnares to project and field coordinators, contractors, and consultans working in Samarinda, East Kalimantan. The findings show thar cut and fill works in sub grade often experience change order. The main causes of change order are differences between drawing and site condition, design changes, and landslide. The average change order’s percentage is 28,26%. Meanwhile change order often occurred during the early phase of construction.Keywords : Change Order, Flexible Pavement, East KalimantanPermalink: http://ejournal.undip.ac.id/index.php/mkts/article/view/3664[How to cite: Sulistio, H. dan Waty, M. (2008), Analysis and Evaluation Change Order  in Flexible Pavement (Case Study: Road Projects in East Kalimantan), Jurnal Media Komunikasi Teknik Sipil, Tahun 16, No. 1, pp. 31-47]

Copyrights © 2008






Journal Info

Abbrev

mkts

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Media Komunikasi Teknik Sipil (ISSN 0854-1809) published twice in a year, in July and December. The article can be product of researches, scientific thoughts or case study, in civil engineering and isn’t formed by politics, commercialism, and subjectivity unsure. This scientific journal ...