Model Simulasi Risiko Rantai Pasok Material Proyek Konstruksi Gedung

Hatmoko, Jati Utomo Dwi (Unknown)
Kistiani, Frida (Unknown)



Article Info

Publish Date
28 Jul 2017

Abstract

Delays related to materials are one of main problems of construction project. An effective supply chain management has a significant role in preventing this type of delay. The aim of this research is develop risk simulation model of construction supply chain in buildings. The materials include steel bars, steel profiles, formwork, and precast concrete, as they are considered the main building material. The supply chain risks are classified from supply, control, process, and demand sides. Monte Carlo simulation has been performed using Cristal Ball software. Risk identification was done through literature review, site observation, and interviews with 29 contractor personnel  working for nine building projects. The simulation results show that the minimum, maximum, and most frequent delays (in days), as follows: steel bars (2.20. 17.05, 11.24); steel profiles (2.12, 15.10, 9.75), formwork (1.79, 16.04, 10.45), precast concrete (1.76, 15.61, 10.24).  The sensitivity analysis shows that delay due to change order from client is the most sensitive for  steel bars, steel profiles, and formwork of 25.5%, 37.4%, dan 17%, respectively. The results of this research is useful for contractors and owners who can use them as a guidance in identifying, predicting, and mitigating supply chain risks for a successful project.

Copyrights © 2017






Journal Info

Abbrev

mkts

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Media Komunikasi Teknik Sipil (ISSN 0854-1809) published twice in a year, in July and December. The article can be product of researches, scientific thoughts or case study, in civil engineering and isn’t formed by politics, commercialism, and subjectivity unsure. This scientific journal ...