MEDIA KOMUNIKASI TEKNIK SIPIL
Volume 13, Nomor 1, Edisi XXXI, PEBRUARI 2005

Model Penjadwalan Pembagian Air pada Sistem Irigasi (Studi Kasus: Irigasi Riam Kanan)

Fachrurazie, Chairil (Unknown)



Article Info

Publish Date
08 Feb 2012

Abstract

The main problem of the agricultural activity is unbalanced system on the water supply to the rice plant field. This problem is faced on the case study of the B.Gt.6 Sub Area B Riam Kanan Irrigation System, which is unmatched between the water supply scheduling and its implementation on the field. To solve this problem is, determining the mathematical model which is easily to calculate. The aim of the mathematical model is to obtain the water supply schedule on the irrigation system from the channel to the rice plant field. The model of the linear program is obtained, which is hoped to be implemented on the irrigation network system actually with the qualitative aspect of the result by the case study in the B.Gt.6. Implementation of this study case obtaining the water supply schedule of the irrigation water are  xi3=36 and yi3=110  for the destination function-1 and also xi3=36 and yi3=113  for the destination function-2. The value of the minimum loss (z) is 6328 per square area unit in one day for the model I and 0 (zero) per square area unit in one day for the model II.Keywords: Water supply scheduling, linear program modelPermalink: http://www.ejournal.undip.ac.id/index.php/mkts/article/view/3895[How to cite: Fachrurazie, C., 2005, Model Penjadwalan Pembagian Air pada Sistem Irigasi (Studi Kasus: Irigasi Riam Kanan), Jurnal Media Komunikasi Teknik Sipil, Volume 13, Nomor 1, pp. 39-47] The main problem of the agricultural activity is unbalanced system on the water supply to the rice plant field. This problem is faced on the case study of the B.Gt.6 Sub Area B Riam Kanan Irrigation System, which is unmatched between the water supply scheduling and its implementation on the field. To solve this problem is, determining the mathematical model which is easily to calculate. The aim of the mathematical model is to obtain the water supply schedule on the irrigation system from the channel to the rice plant field. The model of the linear program is obtained, which is hoped to be implemented on the irrigation network system actually with the qualitative aspect of the result by the case study in the B.Gt.6. Implementation of this study case obtaining the water supply schedule of the irrigation water are xi3=36 and yi3=110 for the destination function-1 and also xi3=36 and yi3=113 for the destination function-2. The value of the minimum loss (z) is 6328 per square area unit in one day for the model I and 0 (zero) per square area unit in one day for the model II. Keywords: Water supply scheduling, linear program model

Copyrights © 2005






Journal Info

Abbrev

mkts

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Media Komunikasi Teknik Sipil (ISSN 0854-1809) published twice in a year, in July and December. The article can be product of researches, scientific thoughts or case study, in civil engineering and isn’t formed by politics, commercialism, and subjectivity unsure. This scientific journal ...