JURNAL KARYA TEKNIK SIPIL
Volume 5, Nomor 2, Tahun 2016

EVALUASI PENGGUNAAN METODE NON TANGGUL DAN TANGGUL PADA LAHAN REKLAMASI PENGEMBANGAN TERMINAL PETI KEMAS PELABUHAN TANJUNG MAS SEMARANG

Ranggi Sanggawuri (Departemen Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang 50275)
Defri Maulana (Departemen Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang 50275)
YI Wicaksono (Departemen Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang 50275)
Wayudi Kushardjoko (Departemen Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang 50275)



Article Info

Publish Date
02 Aug 2016

Abstract

There are limitations on the land development in TPKS lead to make reclamation land with non levee and levee method.The strength of steel pile and batter pile structure construction in each method will be analyzed using Plaxis 2D. The analysis result from Plaxis 2D are safety factor and structure force. The result from first variation uses non levee method has safety factor about 1,27 and has additional cost about Rp.3,880,854,789 from contract (second B variation); the result from second A variation uses levee method with dredging until – 9 m has safety factor about 1,4203 and save the cost about Rp.1,193,035,512 from contract (second B variation); the result from second B variation uses levee method with dredging until – 12,5 m has safety factor about 1.3387 and cost equal to contract about Rp. 211,090,224,932; the result from third variation uses levee method with add geotextile has safety factor about 1,6614 and has additonal cost about Rp.1,233,863,485 from contract (second B variation); the result from fourth variation uses levee method with add anchor has safety factor about 2,3044 and has additional cost about Rp.3,963,658,400 from contract (second B variation). Comparation between non levee method and levee method has result that levee method is better than non levee method.

Copyrights © 2016