JURNAL KARYA TEKNIK SIPIL
Volume 3, Nomor 4, Tahun 2014

RE-DESIGN DAN PENANGANAN BREAKWATER DI PELABUHAN BATANG

Ari Surya Bawono (Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang, 50275)
Rizki Indianto (Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang, 50275)
Indrastono Dwi Atmanto (Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang, 50275)
Bambang Pardoyo (Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang, 50275)



Article Info

Publish Date
13 Oct 2014

Abstract

Onshore espescially needed a prevention to sea water abration towards the  geomorfology of shore. The Ones of prevention is build a breakwater. Breakwater must be analyst for strong to prevent from sea water  pressure are come from the sea wave. That analyst include condition where on slope occured landslide are make The building collapse. On this analyst is settle The manual analysis of slope stability with  Fellenius method and Plaxis analisys for breakwater on sta 00+350 in Ports of  Batang Districs. Result of this analyst is generate 1.25 < Safety of Factor < 1.4 is determined that The slope stability on breakwater is safe but not stable and The handling solution based on construction is used The bore-pile foundation Ø800mm with depth 24 m from seabed and elevation step construction.

Copyrights © 2014