JURNAL KARYA TEKNIK SIPIL
Volume 2, Nomor 1, Tahun 2013

PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) PALUMBUNGAN, PURBALINGGA

Andi Prasetiyanto (Jurusan Teknik Sipil FT. UNDIP Jl. Prof. Soedarto SH., Tembalang Semarang 50275)
Nizar Mahrus (Jurusan Teknik Sipil FT. UNDIP Jl. Prof. Soedarto SH., Tembalang Semarang 50275)
Sri Sangkawati (Jurusan Teknik Sipil FT. UNDIP Jl. Prof. Soedarto SH., Tembalang Semarang 50275)
Robert J. Kodoatie (Jurusan Teknik Sipil FT. UNDIP Jl. Prof. Soedarto SH., Tembalang Semarang 50275)



Article Info

Publish Date
30 Jan 2013

Abstract

Conditions Purbalingga areas potential for the development of Mini Hydro Power Plant, is the fundamental reason for empowering Klawing River District Bobotsari Purbalingga became a source of Mini Hydro Power Plant. The objective of mini hydro power plant planning is to  calculation of dependable flow, the calculation of the electricity which can be produced and made design of hydropower building. The method that apply for flood discharge plan calculation is Rational Method, Dependable flow analyzed by using Weibull Method. Dependable flow for mini hydro power plants amounted to 1.8 m3/s  and the power produced is 641 kW.