Indonesian Journal of Electrical Engineering and Computer Science
Vol 12, No 5: May 2014

The Hybrid Flow Shop Scheduling With Special Time Constraints

Xiaobing Cheng (Beijing Union University)
Mingping Xia (Beijing Union University)
Xiuying Wang (Beijing Union University)
Yongjun Xiao (China Electronic Information Industry Development Research Institute)



Article Info

Publish Date
01 May 2014

Abstract

A constraint satisfaction optimization model is established for just-in-time HFS scheduling problem with limited waiting time. Considering the problem’s complicated characteristic of having binary variables, this paper decomposes it into a Multiple Capacitated Flow Shop Scheduling (MCFS) problem and a machine allocation problem. During the process of solving the MCFS problem, a local search is embedded into the procedure of constraint satisfaction optimization so as to improve the convergence of the algorithm. Data experiments show that both the model and algorithm are feasible and effective. DOI : http://dx.doi.org/10.11591/telkomnika.v12i5.5093

Copyrights © 2014