Indonesian Journal of Electrical Engineering and Computer Science
Vol 4, No 3: December 2016

Optimization of Makespan in Job Shop Scheduling Problem by Golden Ball Algorithm

Fatima Sayoti (LAROSERI Laboratory, Department of Computer Science, Faculty of Sciences, University of Chouaib Doukkali, El Jadida, Morocco)
Mohammed Essaid Riffi (LAROSERI Laboratory, Department of Computer Science, Faculty of Sciences, University of Chouaib Doukkali, El Jadida, Morocco)
Halima Labani (LAMAPI Laboratory, Department of mathematics, Faculty of Sciences, University of Chouaib Doukkali, El Jadida, Morocco)



Article Info

Publish Date
01 Dec 2016

Abstract

Job shop scheduling problem (JSSP) is considered to belong to the class of NP-hard combinatorial optimization problem. Finding a solution to this problem is equivalent to solving different problems of various fields such as industry and logistics. The objective of this work is to optimize the makespan in JSSP using Golden Ball algorithm. In this paper we propose an efficient adaptation of Golden Ball algorithm to the JSSP. Numerical results are presented for 36 instances of OR-Library. The computational results show that the proposed adaptation is competitive when compared with other existing methods in the literature; it can solve the most of the benchmark instances.

Copyrights © 2016