Journals Mining Engineering : Bina Tambang
Vol 3, No 4 (2018): Journals Mining Engineering: Bina Tambang

Estimasi Sumberdaya Batubara dengan Menggunakan Metode Cross Section di Pit 2 PT. Tambang Bukit tambi. Site Padang Kelapo. Kec. Muaro Sebo Ulu. Kab. Batanghari. Provinsi Jambi

Calvin Maharza (Universitas Negeri Padang)
Adree Octova (Universitas Negeri Padang)



Article Info

Publish Date
26 Sep 2024

Abstract

Abstract. PT. Tambang Bukit Tambi is a mining company which currently has been drilling to obtain coal distribution data and the amount of coal available. The drilling was carried out in an area of 50.8 hectares with 14 drill holes. To find out the amount and distribution of coal. resource estimation is needed. Modelling of 3D coal distribution and coal volume calculation can be use as consideration for mining. Estimation of resources and reserves of minerals important for ease of exploitation commercially of deposits of minerals, because the resources and reserve estimation results can determine investment and estimates the time required by the company in carrying out mine business This research uses cross setion method for calculating of coal volume and coal tonnage, with the help of image processing software that is minescape 4.11.9. the estimation must be made based on the number of blocks that are available after being corrected to the topographic limit. The total coal tonnage obtained in the study area is 3.360.240 tons and Overburden is 4.317.300 bcm. with 1.2 bcm/ton stripping ratio.Keywords : Estimation. Sumberdaya. Ordinary Kriging. variogram. CoalAbstract. PT. Tambang Bukit Tambi is a mining company which currently has been drilling to obtain coal distribution data and the amount of coal available. The drilling was carried out in an area of 50.8 hectares with 14 drill holes. To find out the amount and distribution of coal. resource estimation is needed. Modelling of 3D coal distribution and coal volume calculation can be use as consideration for mining. Estimation of resources and reserves of minerals important for ease of exploitation commercially of deposits of minerals, because the resources and reserve estimation results can determine investment and estimates the time required by the company in carrying out mine business This research uses cross setion method for calculating of coal volume and coal tonnage, with the help of image processing software that is minescape 4.11.9.. the estimation must be made based on the number of blocks that are available after being corrected to the topographic limit. The total coal tonnage obtained in the study area is 3.360.240 tons and Overburden is 4.317.300 bcm. with 1.2 bcm/ton stripping ratio.Keywords : Estimation. Sumberdaya. Ordinary Kriging. variogram. Coal

Copyrights © 2018






Journal Info

Abbrev

mining

Publisher

Subject

Earth & Planetary Sciences

Description

Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini ...