ELKHA : Jurnal Teknik Elektro
Vol 8, No 1 (2016): Edisi Bulan Maret 2016

Kajian Tekno Ekonomi Potensi Sampah Kota Pontianak Sebagai Sumber Pembangkit Listrik Tenaga Uap (PLTU)

Budiman, Aris (Unknown)



Article Info

Publish Date
23 Jan 2016

Abstract

Abstract– One of the city problem is waste and one of the reasons is the community lifestyle and denser population due to the high growth rate. Therefore, the problem of waste needs immediate and significant solutions. One of the solutions is to build the Steam Power Plant fueled by organic waste in Pontianak City. In this thesis will be analyzed theinitial aspects of Steam Power Plant construction fueled by organic waste both technically and economically. This study proposes the feasibility assessment of construction. The research regarding the waste potency especially organic waste in Pontianak City as a source of Steam Power Plant is able to produce 2.87 MW of electrical output power. Furthermore, the economic cost of the Steam Power Plant construction is Rp. 119,833,472,771,- with a Payback Period of 2.69 years which the economic lifetime of the Steam Power Plant up to 25 years, Net Present Value (NPV) of Rp. 279,032,579522.70,- , Internal Rate of Return (IRR) of 30.37 % , and Benefit Cost Ratio (BCR) of 2.98. Keywords– techno-economic, waste, Steam Power Plant, electrical

Copyrights © 2016






Journal Info

Abbrev

Elkha

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Energy Industrial & Manufacturing Engineering

Description

The ELKHA publishes high-quality scientific journals related to Electrical and Computer Engineering and is associated with FORTEI (Forum Pendidikan Tinggi Teknik Elektro Indonesia / Indonesian Electrical Engineering Higher Education Forum). The scope of this journal covers the theory development, ...