ELKHA : Jurnal Teknik Elektro
Vol 7, No 1 (2015): Edisi Bulan Maret 2015

Studi Kelayakan Pemanfaatan Pembangkit Listrik Kincir Air Terapung Di Desa Ella Hilir Kecamatan Ella Hilir Kabupaten Melawi

Rahmadi, Joni (Unknown)
Yusuf, Ismail (Unknown)
Priyatman, Hendro (Unknown)



Article Info

Publish Date
01 Jul 2015

Abstract

Abstract– Hydroelectric Power Plant (HEPP) use a boost from the water with a specific discharge and dtransformasikan into electricity by generators. River In Rural District of Ella Ella Downstream Downstream Melawi has the potential to be used as energy alternatives, with water flowing speed of 1m / s to 3 m /s. Utilization of Power Plant Feasibility Study Floating In Water Mill Village District of Ella Ella Downstream Downstream Melawi expected to provide an overview as well as a reference for the public and the government about the prospects and benefits are obtained if done on technology implementation or iplementasi floating waterwheel. Based on the lowest current 1 m / s Watermill floating able to produce 533.70 Watt, the highest river currents capable of producing 144,409.90 Watt, a comparison is electricity derived from PT. PLN with a reference group of R1 / 900 where the electricity tariff (TDL) around Rp. 650, - it is not worth the investment, the comparison is electricity derived from the generator, the power specification 1 kVA and price premium / liter Rp. 6.600, - (January 2015) it is well worth the investment Keywords– hydropower, Watermill, Streams, Generator

Copyrights © 2015






Journal Info

Abbrev

Elkha

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Energy Industrial & Manufacturing Engineering

Description

The ELKHA publishes high-quality scientific journals related to Electrical and Computer Engineering and is associated with FORTEI (Forum Pendidikan Tinggi Teknik Elektro Indonesia / Indonesian Electrical Engineering Higher Education Forum). The scope of this journal covers the theory development, ...