Jurnal Penelitian Hasil Hutan
Vol 20, No 2 (2002): Buletin Penelitian Hasil Hutan

KAJIAN PRODUKTIVITAS ALAT MUAT KAYU KPH2 DI BKPH GUNUNG HALU, KPH BANDUNG SELATAN PERUM PERHUTANI UNIT III JAWA BARAT

Zakaria Basari (Pusat penelitian dan pengembangan hasil hutan)
Sona Suhartana (Pusat penelitian dan pengembangan hasil hutan)
Wesman Endom (Pusat penelitian dan pengembangan hasil hutan)
Dulsalam Dulsalam (Pusat penelitian dan pengembangan hasil hutan)
Yayan Sugilar (Pusat penelitian dan pengembangan hasil hutan)



Article Info

Publish Date
29 Aug 2017

Abstract

The KPH2 a type of equipment for wood loading into truck was designed by Forest Engeenering and Forest Harvest Divition Forest Products Research Centre Bogor. An operation trial has been done in BKPH Gunung hatu, Bandung Selatan Forest District, Perum Perhutani Unit III West Java.The objective of this study is to see the productivity and operation cost of loading rasamala log ( Altingia excelsa) into truck. using a helper KPH2 and by manual system.The results showed that productivity of KPH2 equipment and manual were 0.02 m3 minute/m and 0,04 m/minute/m, with operation cost of Rp 18.523,00/m3 and Rp 2.000,00/m3 respectively. 

Copyrights © 2002






Journal Info

Abbrev

JPHH

Publisher

Subject

Agriculture, Biological Sciences & Forestry Chemical Engineering, Chemistry & Bioengineering Chemistry Energy Materials Science & Nanotechnology

Description

Jurnal Penelitian Hasil Hutan adalah jurnal ilmiah nasional yang mempublikasikan tulisan yang telah dicermati oleh Dewan Redaksi dan Mitra Bestari di bidang hasil hutan. Tulisan dalam Jurnal Penelitian Hasil Hutan mencerminkan inovasi dan hasil penelitian dasar dan terapan yang berkualitas di bidang ...