Indonesian Journal of Electrical Engineering and Computer Science
Vol 10, No 3: July 2012

Economic Dispatch Thermal Generator Using Modified Improved Particle Swarm Optimization

Andi Muhammad Ilyas (Unknown)
M. Natsir Rahman (Unknown)



Article Info

Publish Date
24 Jun 2012

Abstract

Fuel cost of a thermal generator is its own load functions. In this research, Modified Improved Particle Swarm Optimization (MIPSO) is applied to calculate economic dispatch. Constriction Factor Approach (CFA) is used to modify IPSO algorithm because of the advantage to improve the ability of global searching and avoid local minimum so that the time needed to converge become faster. Simulation results achieved by using  MIPSO method at the time of peak load of of 9602 MW, obtained generation cost is Rp 7,366,912,798,34 per hour, while generation cost of real system is Rp. 7,724,012,070.30 per hour. From the simulation result can be concluded that MIPSO can reduce the generation cost of  500 kV Jawa Bali transmission system of Rp 357,099,271.96 per hour or equal to 4,64%. DOI: http://dx.doi.org/10.11591/telkomnika.v10i3.880

Copyrights © 2012