JURIKOM (Jurnal Riset Komputer)
Vol 6, No 6 (2019): Desember 2019

Estimasi Biaya Perangkat Lunak SIMAS Universitas XYZ Menggunakan Metode Function Points

Lovita Lisa Nur Afifah (Universitas Internasional Semen Indonesia)
Setya Suprayogi (Universitas Internasional Semen Indonesia)
Renny Sari Dewi (Universitas Internasional Semen Indonesia)



Article Info

Publish Date
16 Dec 2019

Abstract

Accurate cost estimation in developing a software is very important to avoid over-estimating or under-estimating. The estimation method used is using the Function Points method. The stages of the Function Points method are the first step to compose 5 main parameters and calculate the total UCP, the second step to calculate the total RCAF by referring to 14 characteristics, the third step to calculate the Function Point, the fourth step to calculate the effort, the fifth step to calculate SLoC, the sixth step to calculate SLoC to effort and seventh counts the distribution of effort to activity. From the research that has been done, the estimated cost of developing SIMAS XYZ University software, it is concluded that if XYZ universities want to develop SIMAS software, it will require approximately IDR77,736,766 or equivalent to effort 1,520.74 man / hour.

Copyrights © 2019






Journal Info

Abbrev

jurikom

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering

Description

JURIKOM (Jurnal Riset Komputer) membahas ilmu dibidang Informatika, Sistem Informasi, Manajemen Informatika, DSS, AI, ES, Jaringan, sebagai wadah dalam menuangkan hasil penelitian baik secara konseptual maupun teknis yang berkaitan dengan Teknologi Informatika dan Komputer. Topik utama yang ...