Rang Teknik Journal
Vol 3, No 2 (2020): Vol. 3 No. 2 Juni 2020

ANALISA PENGENDALIAN BANJIR AKIBAT PELUAPAN DEBIT ALIRAN DENGAN PERKUATAN TEBING TIPE SHEET PILE “Studi Kasus Sungai Batang Lumpo Kabupaten Pesisir Selatan”

Nofrizal Nofrizal (Teknik Sipil Institut Teknologi Padang Padang)
Febi Silfia (Teknik Sipil Institut Teknologi Padang Padang)



Article Info

Publish Date
02 Jun 2020

Abstract

Flooding ia caused by the increased volume of water’s volume in the river or lake so that water is out of its natural limits. The flooding is mostly caused by inadequate river capacity to accommodate river discharge. The amount of river discharge at the time of flood is caused by the increasing amount of surface runoff from the rains that fall in the catchment area. Based on the preliminary survey conducted, it was found that the frequency of flooding in the Batang Lumpo river area is 2-3 times a year with a height ranging from 0.5 to 1.5 meters from the soil surface with the duration of inundation ranges from 4 to 6 hours. Areas affected by flooding ranging from the area of Nagari Taratak Tengah Lumpo Kecamatan IV Jurai down to the downstream river at Nagari Pasar Baru Kecamatan Bayang. By the result of the analysis obtained flood discharge using Rational method Q 100 years = 237, 26 m³ / dt, high h = 2.7 m, the high value of W = 1.16 m length Sheet Pile in flood condition = 4.14 m, Maximum Moment Mmax = 6, 31 tm and sheet pile length in dry condition = 3.16 m, Mmax Moment = 7,125 t.m.

Copyrights © 2020






Journal Info

Abbrev

RANGTEKNIKJOURNAL

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Computer Science & IT Electrical & Electronics Engineering Engineering

Description

RANG TEKNIK JOURNAL, merupakan Jurnal Penelitian dan Kajian Ilmiah yang diterbitkan Fakultas Teknik Universitas Muhammadiyah Sumatera Barat yang terbit 2 (dua) kali dalam ...