Journal of Electrical Power Control and Automation (JEPCA)
Vol 2, No 2 (2019): Desember

Rancang Bangun Miniatur Pembangkit Listrik Tenaga Mikrohidro Dibengkel Teknik Listrik Universitas Batanghari Jambi

Ottentri Ottentri (Program Studi Teknik Elekro, Fakultas Teknik, Universitas Batanghari)
Hendi Matalata (Program Studi Teknik Elekro, Fakultas Teknik, Universitas Batanghari)



Article Info

Publish Date
03 Jul 2020

Abstract

The need for electrical energy is a necessity that can not be ditawar–tawar anymore for a life worthy of every person in this day. Generally, remote rural areas located in mountainous areas have a large potential of water energy, so that the hydroelectric power plant is one of the energy sources that can be developed. Jambi is an area covered with Batanghari River flows. This research aims to know how the work process of Microhydro power plant.  Components of the essential components of miniature microhydro power plants are reservoirs, rapid pipes, turbines, generators where these components are not loose bias, interrelated to one another. Round of Tubin obtained from the experiment is 400 rpm with water discharge 0.0016 m3/s. The maximum voltage generated by the generator is 18 volts. Voltage generated from the generator to charging the Batrai used inverter of 13.1 volts. The load will remain on even though the main energy source is the generator stop in the same, because the energy of the second is Batrai.

Copyrights © 2019






Journal Info

Abbrev

jec

Publisher

Subject

Electrical & Electronics Engineering

Description

Journal of Electrical Power Control and Automation (JEPCA) rises 2 (two) times a year which is in June and December. The journal publishes articles of research results, and the articles that are entered should not be the result of plagiarism and have not yet been published elsewhere. The article ...