IPTEK Journal of Proceedings Series
No 1 (2019): 4th International Seminar on Science and Technology 2018 (ISST 2018)

Risk Based Analysis for Evaluating of Inspection Scope at PLTGU Muara Karang

Dadang Rohmansyah (Department of Mechanical Engineering Institut Teknologi Sepuluh Nopember)
Suwarno Suwarno (Department of Mechanical Engineering Institut Teknologi Sepuluh Nopember)



Article Info

Publish Date
21 Apr 2019

Abstract

Power plant operation and plant aging influence plant reliability, strategy, and cost maintenance of PLTGU Block 1 Muara Karang. Several approach has been done to increase maintenance effectiveness as well as reducing it cost. Nevertheless, other strategies are necessary to be further developed adopting best practices in industries. In this study, we used Risk Based Inspection (RBI) method to evaluate scope of inspection on equipment in the HRSG 1.1 Muara Karang. Equipment has been investigated are pressure vessel, heat exchanger tube, and piping. The number of equipment under investigated are 26, where 10 equipments included in the medium risk category and 16 equipments included in the low risk category. There are 2 equipments where the inspection time interval is ≤ 2 years i.e. high pressure superheater 1 & 2

Copyrights © 2019






Journal Info

Abbrev

jps

Publisher

Subject

Computer Science & IT

Description

IPTEK Journal of Proceedings Series publishes is a journal that contains research work presented in conferences organized by Institut Teknologi Sepuluh Nopember. ISSN: 2354-6026. The First publication in 2013 year from all of full paper in International Conference on Aplied Technology, Science, and ...