EVALUASI FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PENYELESAIAN PROYEK KONSTRUKSI DENGAN PENDEKATAN ANALYTICAL HIERARCHY PROCESS (AHP) DI KOTA PADANG

Lisa Rahmi (Universitas Negeri Padang)
firman firman (Universitas Negeri Padang)
Gesit Tabrani (Universitas Negeri Padang)



Article Info

Publish Date
28 Jun 2019

Abstract

This study aims to find out, what are the factors that cause delays in project development in Padang City. The population in this study were several contractors registered as members of GAPENSI Kota Padang. The number of samples is the majority contractor, consisting of 3 intermediate contractors and 5 small contractors. The method used is a cause and effect diagram (fishbone) and Analytical Hierarchy Process (AHP). The results of this study are the main factors that cause delays in the repair of construction projects, namely: (1) delays caused by specifications / design changes with a value of 0.1265, (2) weather and natural disasters with a value of 0.1144, (3 )) error in choosing the construction method with a weight value of 0.0912.Keywords: Construction Project Delay Factors, Cause-Effect Diagram (Fish Bone), Analytical Hierarchy process (AHP).

Copyrights © 2019






Journal Info

Abbrev

pek

Publisher

Subject

Economics, Econometrics & Finance

Description

Jurnal Ecogen is a peer-reviewed journal and scientific journal devoted to the publication of original papers published by Universitas Negeri Padang. Since 2018, this journal has become an open-access peer-reviewed online journal of economics and education studies published by Universitas Negeri ...